How does the draft Environment Impact Assessment (EIA) Notification, 2020 differ from the existing EIA Notification, 2006?

Points to Remember:

  • Key differences between the Draft EIA Notification, 2020 and the EIA Notification, 2006 lie in the scope of projects requiring EIA, public consultation, and the powers granted to the authorities.
  • The 2020 draft aimed for streamlined processes but faced criticism for potentially weakening environmental safeguards.
  • The 2006 notification, while having its limitations, provided a more robust framework for environmental impact assessment.

Introduction:

The Environment Impact Assessment (EIA) process is crucial for sustainable development. It aims to identify, predict, evaluate, and mitigate the environmental impacts of proposed projects. India’s EIA Notification, 2006, established a framework for this process. However, the government released a draft EIA Notification, 2020, proposing significant changes. This response analyzes the key differences between the 2006 notification and the 2020 draft, focusing on the implications for environmental protection. The 2020 draft, while aiming for efficiency, sparked widespread protests due to concerns about its potential to weaken environmental safeguards. This analysis will adopt a factual and analytical approach, drawing on publicly available information and expert opinions.

Body:

1. Scope and Applicability:

  • 2006 Notification: Covered a broad range of projects, categorized based on their potential environmental impact. It mandated EIA for projects exceeding specified thresholds (e.g., capacity, area).
  • 2020 Draft: Proposed to significantly reduce the number of projects requiring EIA, exempting several categories, including those related to infrastructure development. This expansion of exemptions raised concerns about potentially overlooking projects with significant environmental consequences. For instance, the draft proposed exempting projects related to renewable energy, which contradicts the need for stringent environmental assessment in such crucial sectors.

2. Public Consultation:

  • 2006 Notification: Included a relatively detailed process for public consultation, allowing for objections and suggestions. While not perfect, it provided a mechanism for citizen participation.
  • 2020 Draft: Significantly curtailed public consultation. The timeframe for public comments was drastically reduced, and the process was made less transparent. This raised concerns about the ability of affected communities to effectively voice their concerns. The reduced time frame and online-only submission options limited access for many marginalized communities.

3. Post-Project Monitoring:

  • 2006 Notification: Included provisions for post-project monitoring to ensure compliance with environmental conditions.
  • 2020 Draft: While retaining post-project monitoring, the specifics were less detailed, raising concerns about the effectiveness of enforcement. The reduced emphasis on post-project monitoring could lead to a lack of accountability for environmental violations.

4. Decision-Making Power:

  • 2006 Notification: Distributed decision-making powers across various levels of government, allowing for regional considerations.
  • 2020 Draft: Centralized more power at the national level, potentially reducing the responsiveness to local environmental concerns. This centralization could lead to a disregard for the unique environmental sensitivities of different regions.

5. Ex-post facto clearances:

  • 2006 Notification: Did not explicitly allow for ex-post facto clearances (approvals granted after project commencement).
  • 2020 Draft: Allowed for ex-post facto clearances under certain conditions, raising concerns about rewarding non-compliance. This provision could incentivize developers to start projects without proper environmental clearances, leading to irreversible environmental damage.

Conclusion:

The Draft EIA Notification, 2020, differed significantly from the 2006 notification, primarily by reducing the scope of projects requiring EIA, curtailing public consultation, and centralizing decision-making power. While aiming for streamlined processes, it raised serious concerns about weakening environmental safeguards and potentially compromising sustainable development. The 2006 notification, despite its limitations, offered a more robust framework for environmental protection and citizen participation. A way forward involves revisiting the 2020 draft, incorporating feedback from environmental experts and civil society, and strengthening the public consultation process. A balanced approach is crucial, ensuring both efficient project clearances and robust environmental protection, upholding the constitutional mandate of protecting the environment for present and future generations. The focus should be on strengthening the existing framework rather than weakening it, ensuring a holistic approach to development that prioritizes environmental sustainability and social justice.