21. Material train is a ________ train. A. Departmental B. Permanent C. Both D. None of these

Departmental
Permanent
Both
None of these

Detailed SolutionMaterial train is a ________ train. A. Departmental B. Permanent C. Both D. None of these

22. Maximum permissible speed is fixed by ________. A. CRS B. GM C. MT D. None of these

CRS
GM
MT
None of these

Detailed SolutionMaximum permissible speed is fixed by ________. A. CRS B. GM C. MT D. None of these

23. Motor coach is a ________ coach. A. Self Propelled B. Self System C. Self Minor D. None of these

Self Propelled
Self System
Self Minor
None of these

Detailed SolutionMotor coach is a ________ coach. A. Self Propelled B. Self System C. Self Minor D. None of these

24. Target time for departing ART during day is 30 minutes and during night is ________ minutes. A. 40 B. 50 C. 60 D. 45

40
50
60
45

Detailed SolutionTarget time for departing ART during day is 30 minutes and during night is ________ minutes. A. 40 B. 50 C. 60 D. 45

25. The number of line clear ticket in down direction is ________. A. T/C 1425 B. T/D 1426 C. T/A 1425 D. T/D 1425

T/C 1425
T/D 1426
T/A 1425
T/D 1425

Detailed SolutionThe number of line clear ticket in down direction is ________. A. T/C 1425 B. T/D 1426 C. T/A 1425 D. T/D 1425

26. Target time for dispatch of ARME from single exit siding at night is ________ minutes. A. 10 B. 05 C. 08 D. 25

10
5
8
25

Detailed SolutionTarget time for dispatch of ARME from single exit siding at night is ________ minutes. A. 10 B. 05 C. 08 D. 25

27. The number of line clear ticket in up direction is ________. A. T/C 1425 B. T/D 1426 C. T/A 1425 D. T/B 1425

T/C 1425
T/D 1426
T/A 1425
T/B 1425

Detailed SolutionThe number of line clear ticket in up direction is ________. A. T/C 1425 B. T/D 1426 C. T/A 1425 D. T/B 1425

28. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site? A. 1200 Meter B. 1000 Meter C. 800 Meter D. 500 Meter

1200 Meter
1000 Meter
800 Meter
500 Meter

Detailed SolutionWhere the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site? A. 1200 Meter B. 1000 Meter C. 800 Meter D. 500 Meter

29. The length of long welded rail under Indian conditions should be about A. 1 km B. 2 km C. 0.50 km D. None of these

1 km
2 km
0.50 km
None of these

Detailed SolutionThe length of long welded rail under Indian conditions should be about A. 1 km B. 2 km C. 0.50 km D. None of these

30. What does the Slip siding protects? A. Station Section B. Station Limit C. Block Section D. Siding

Station Section
Station Limit
Block Section
Siding

Detailed SolutionWhat does the Slip siding protects? A. Station Section B. Station Limit C. Block Section D. Siding