[amp_mcq option1=”Single” option2=”Double” option3=”Triple” option4=”None of these” correct=”option2″]
Indian railway
2. During power failure in automatic block section, on which authority relief engine will proceed? A. TA-912 B. TB-912 C. TC-912 D. TD-912
[amp_mcq option1=”TA-912″ option2=”TB-912″ option3=”TC-912″ option4=”TD-912″ correct=”option4″]
3. Hand shunting speed is ________ A. 5 kmph B. 10 kmph C. 8 kmph D. None of these
[amp_mcq option1=”5 kmph” option2=”10 kmph” option3=”8 kmph” option4=”None of these” correct=”option2″]
Detailed SolutionHand shunting speed is ________ A. 5 kmph B. 10 kmph C. 8 kmph D. None of these
4. Competency certificate of the gateman of interlocked engineering gate is signed by A. SSE/P.way B. SSE/Sig. C. Both D. None of these
[amp_mcq option1=”SSE/P.way” option2=”SSE/Sig.” option3=”Both” option4=”None of these” correct=”option3″]
5. Staff of ________ department shall protect the material train while working in block section. A. Operation B. C & W C. Engineering D. None of these
[amp_mcq option1=”Operation” option2=”C & W” option3=”Engineering” option4=”None of these” correct=”option2″]
6. Competency certificate of the gateman of interlocked engineering gate is issued by A. SSE/P.way B. SSE/Sig. C. SSE/C & W D. None of these
[amp_mcq option1=”SSE/P.way” option2=”SSE/Sig.” option3=”SSE/C & W” option4=”None of these” correct=”option1″]
7. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at A. 270 meters B. 90 meters C. 400 meters D. None of these
[amp_mcq option1=”270 meters” option2=”90 meters” option3=”400 meters” option4=”None of these” correct=”option1″]
8. Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block? A. T-369(3b) B. PLCT C. Memo + Hand Signal D. Starter should be taken off
[amp_mcq option1=”T-369(3b)” option2=”PLCT” option3=”Memo + Hand Signal” option4=”Starter should be taken off” correct=”option1″]
9. When ISMD attached train is allowed to run through on PF line the speed must be A. 5 kmph B. 8 kmph C. 10 kmph D. None of these
[amp_mcq option1=”5 kmph” option2=”8 kmph” option3=”10 kmph” option4=”None of these” correct=”option1″]
10. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train. A. First B. Second C. Third D. None of these
[amp_mcq option1=”First” option2=”Second” option3=”Third” option4=”None of these” correct=”option1″]