Indian railway
45 meters
50 meters
100 meters
1000 meters
Answer is Right!
Answer is Wrong!
22. Colour of the semaphore calling on signal is ________. A. Red B. White C. Green D. None of these
Red
White
Green
None of these
Answer is Right!
Answer is Wrong!
23. What is the speed of second train on double line section running on T/A602? A. 20 kmph B. 15 kmph C. 10 kmph D. 8 kmph
20 kmph
15 kmph
10 kmph
8 kmph
Answer is Right!
Answer is Wrong!
24. The number of Train examination report is ________. A. T/431 B. T/432 C. T/436 D. T/436
T/431
T/432
T/436
T/436
Answer is Right!
Answer is Wrong!
25. Which marker is available in repeating signal? A. G-Marker B. C-Marker C. P-Marker D. R-Marker
G-Marker
C-Marker
P-Marker
R-Marker
Answer is Right!
Answer is Wrong!
26. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working. A. 07 B. 09 C. 10 D. 15
27. ________ form shall be used by GDR when a person falls out of train injured or killed. A. ACC2 B. ACC3 C. ACC4 D. None of these
ACC2
ACC3
ACC4
None of these
Answer is Right!
Answer is Wrong!
28. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal? A. At 1st facing point of station B. Facing point of concern line C. 45 meters beyond the obstruction D. No need
At 1st facing point of station
Facing point of concern line
45 meters beyond the obstruction
No need
Answer is Right!
Answer is Wrong!
29. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ? A. 15 kmph B. 10 kmph C. 8 kmph D. Normal
15 kmph
10 kmph
8 kmph
Normal
Answer is Right!
Answer is Wrong!
30. When a running line is occupied ________ entry must be made in TSR. A. Red Ink B. Green Ink C. Yellow Ink D. None of these
Red Ink
Green Ink
Yellow Ink
None of these
Answer is Right!
Answer is Wrong!