Indian railway
Upto 1 Year
Upto 2 Years
Upto 3 Years
Upto 6 Months
Answer is Right!
Answer is Wrong!
2. WTT will be issued ________. A. Once in a Year B. Two in a Year C. Three in Year D. None of these
Once in a Year
Two in a Year
Three in Year
None of these
Answer is Right!
Answer is Wrong!
3. How much minimum BP pressure is reduce to require to apply brake in a goods train? A. Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2 or more
Less than1.0 kg/cm2
1.00 kg/cm2 to 2.00 kg/cm2
1.00 kg/cm2 to 1.50 kg/cm2
2.00 kg/cm2 or more
Answer is Right!
Answer is Wrong!
4. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident. A. Engineering B. Mechanical C. C & W D. None of these
Engineering
Mechanical
C & W
None of these
Answer is Right!
Answer is Wrong!
5. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project? A. Kerala B. Tamil Nadu C. Gujarat D. Andhra Pradesh
Kerala
Tamil Nadu
Gujarat
Andhra Pradesh
Answer is Right!
Answer is Wrong!
6. By whom the rear portion of train left behind in block section protected? A. By Guard B. By LP C. By engineearing official D. No need to protect the load
By Guard
By LP
By engineearing official
No need to protect the load
Answer is Right!
Answer is Wrong!
7. What is the maximum speed of a train while view is obstructed due to thick and foggy weather? A. Normal speed B. 15 kmph C. 30 kmph D. 60 kmph
Normal speed
15 kmph
30 kmph
60 kmph
Answer is Right!
Answer is Wrong!
8. Track maintenance machine is permitted to work during A. Day B. Day and Night C. Day clear weather D. None of these
Day
Day and Night
Day clear weather
None of these
Answer is Right!
Answer is Wrong!
9. When the train has not cleared the fouling marks. Driver to give ________ whistle A. 03 long B. 02 long C. 01 long D. None of these
03 long
02 long
01 long
None of these
Answer is Right!
Answer is Wrong!
10. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is A. 25 kmph B. 20 kmph C. 15 kmph D. None of these
25 kmph
20 kmph
15 kmph
None of these
Answer is Right!