21. What should be done by guard if train entering in block section without authority to proceed? A. Stop the Train B. Inform to SM C. Protect the Train D. All of above

Stop the Train
Inform to SM
Protect the Train
All of above

Detailed SolutionWhat should be done by guard if train entering in block section without authority to proceed? A. Stop the Train B. Inform to SM C. Protect the Train D. All of above

22. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed. A. T/B-912 B. T/C-912 C. T/A-912 D. None of these

T/B-912
T/C-912
T/A-912
None of these

Detailed SolutionIn automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed. A. T/B-912 B. T/C-912 C. T/A-912 D. None of these

23. For Temporary diversions, the permission must be obtained from A. CRS B. Railway Board C. CE D. None of these

CRS
Railway Board
CE
None of these

Detailed SolutionFor Temporary diversions, the permission must be obtained from A. CRS B. Railway Board C. CE D. None of these

24. Permission to run C’ class ODC is given by CRS and the maximum speed of train is A. 02 B. 03 C. 04 D. 06

2
3
4
6

Detailed SolutionPermission to run C’ class ODC is given by CRS and the maximum speed of train is A. 02 B. 03 C. 04 D. 06

25. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night. A. 20 B. 15 C. 25 D. None of these

20
15
25
None of these

Detailed SolutionOn DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night. A. 20 B. 15 C. 25 D. None of these

26. Booked speed of a train is ________ percent less than maximum permissible speed A. 5 B. 10 C. 15 D. 20

5
10
15
20

Detailed SolutionBooked speed of a train is ________ percent less than maximum permissible speed A. 5 B. 10 C. 15 D. 20

27. On which authority relief train shall be dispatched for obstructed block section? A. PLCT B. T/A602 C. On memo D. None of these

PLCT
T/A602
On memo
None of these

Detailed SolutionOn which authority relief train shall be dispatched for obstructed block section? A. PLCT B. T/A602 C. On memo D. None of these

28. Target time for ARME from double exit siding is? A. 20 minutes B. 30 minutes C. 45 minutes D. 60 minutes

20 minutes
30 minutes
45 minutes
60 minutes

Detailed SolutionTarget time for ARME from double exit siding is? A. 20 minutes B. 30 minutes C. 45 minutes D. 60 minutes

29. TSL is started between those two stations at which cross over facility are available and A. A Class/IBS B. C Class/IBS C. D Class/IBC D. None of these

A Class/IBS
C Class/IBS
D Class/IBC
None of these

Detailed SolutionTSL is started between those two stations at which cross over facility are available and A. A Class/IBS B. C Class/IBS C. D Class/IBC D. None of these

30. Maximum impact speed when shunting a single roller bearing fitted stock must be? A. 3 kmph B. 4 kmph C. 5 kmph D. 6 kmph

3 kmph
4 kmph
5 kmph
6 kmph

Detailed SolutionMaximum impact speed when shunting a single roller bearing fitted stock must be? A. 3 kmph B. 4 kmph C. 5 kmph D. 6 kmph