22. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed. A. T/B-912 B. T/C-912 C. T/A-912 D. None of these
T/B-912
T/C-912
T/A-912
None of these
Answer is Right!
Answer is Wrong!
23. For Temporary diversions, the permission must be obtained from A. CRS B. Railway Board C. CE D. None of these
CRS
Railway Board
CE
None of these
Answer is Right!
Answer is Wrong!
24. Permission to run C’ class ODC is given by CRS and the maximum speed of train is A. 02 B. 03 C. 04 D. 06
2
3
4
6
Answer is Right!
Answer is Wrong!
25. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night. A. 20 B. 15 C. 25 D. None of these
20
15
25
None of these
Answer is Right!
Answer is Wrong!
26. Booked speed of a train is ________ percent less than maximum permissible speed A. 5 B. 10 C. 15 D. 20
5
10
15
20
Answer is Right!
Answer is Wrong!
27. On which authority relief train shall be dispatched for obstructed block section? A. PLCT B. T/A602 C. On memo D. None of these
PLCT
T/A602
On memo
None of these
Answer is Right!
Answer is Wrong!
28. Target time for ARME from double exit siding is? A. 20 minutes B. 30 minutes C. 45 minutes D. 60 minutes
20 minutes
30 minutes
45 minutes
60 minutes
Answer is Right!
Answer is Wrong!
29. TSL is started between those two stations at which cross over facility are available and A. A Class/IBS B. C Class/IBS C. D Class/IBC D. None of these
A Class/IBS
C Class/IBS
D Class/IBC
None of these
Answer is Right!
Answer is Wrong!
30. Maximum impact speed when shunting a single roller bearing fitted stock must be? A. 3 kmph B. 4 kmph C. 5 kmph D. 6 kmph
3 kmph
4 kmph
5 kmph
6 kmph
Answer is Right!
Answer is Wrong!