31. Economic Batch Quantity depends on . . . . . . . . and . . . . . . . . costs.

material, labour
set-up costs, carrying
transportation, carrying
warehousing, labour

Join Our Telegram Channel

132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube
class="read-more button" href="https://exam.pscnotes.com/mcq/economic-batch-quantity-depends-on-and-costs/#more-55924">Detailed SolutionEconomic Batch Quantity depends on . . . . . . . . and . . . . . . . . costs.

32. An increase in fixed costs will result, in which of the following?

A decrease in the contribution sales ratio
A decrease in the contribution per point
An increase in the margin of safety

Detailed SolutionAn increase in fixed costs will result, in which of the following?

33. Packing cost is ________.

production cost
selling cost
administration cost
distribution cost

Subscribe on YouTube
button" href="https://exam.pscnotes.com/mcq/packing-cost-is-________/#more-55900">Detailed SolutionPacking cost is ________.

34. Success of cost reduction initiatives are evaluated by accurate

cyclical factors
indexed technique
price estimation
cost estimation

Subscribe on YouTube
href="https://exam.pscnotes.com/mcq/success-of-cost-reduction-initiatives-are-evaluated-by-accurate/#more-55899">Detailed SolutionSuccess of cost reduction initiatives are evaluated by accurate

35. When the completion stage of a contract is less than $$\frac{1}{4},$$ the total expenditure on the contract is transferred to . . . . . . . . account.

Work-in-progress
Profit and loss account
Miscellaneous account
None of these

Join Our Telegram Channel

48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube button" href="https://exam.pscnotes.com/mcq/when-the-completion-stage-of-a-contract-is-less-than-frac14-the-total-expenditure-on-the-contract-is-transferred-to-account/#more-55866">Detailed SolutionWhen the completion stage of a contract is less than $$\frac{1}{4},$$ the total expenditure on the contract is transferred to . . . . . . . . account.

36. Match the following. List-I (Variances) List-II (Formulae) a. MCV 1. SP (RSQ – AQ) b. MPV 2. SP (SQ – AQ) c. MUV 3. AQ consumed (SP – AP) d. MMV 4. SC – AC

a-4, b-3, c-2, d-1
a-2, b-1, c-4, d-3
a-4, b-1, c-2, d-3
a-3, b-4, c-2, d-1

Detailed SolutionMatch the following. List-I (Variances) List-II (Formulae) a. MCV 1. SP (RSQ – AQ) b. MPV 2. SP (SQ – AQ) c.

11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube
MUV 3. AQ consumed (SP – AP) d. MMV 4. SC – AC

37. Product which requires large amount of resources, but incur low per unit cost is classified as

product under costing
product over costing
expected under cost
expected over cost

Detailed SolutionProduct

which requires large amount of resources, but incur low per unit cost is classified as

38. Cost of sales plus profit is _______.

selling price
value of finished product
value of goods produced
value of stocks

Subscribe on YouTube
is _______." class="read-more button" href="https://exam.pscnotes.com/mcq/cost-of-sales-plus-profit-is-_______/#more-55827">Detailed SolutionCost of sales plus profit is _______.

39. Departmentalization of overhead is known as ________.

primary distribution
secondary distribution
absorption
allocation

Join Our Telegram Channel

124.1c-6.3-23.7-24.8-42.3-48.3-48.6C458.8 64 288 64 288 64S117.2 64 74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube href="https://exam.pscnotes.com/mcq/departmentalization-of-overhead-is-known-as-________/#more-55821">Detailed SolutionDepartmentalization of overhead is known as ________.

40. The basis for the payment of cash by contractee under contract is ________.

work certified
work uncertified
contract cost
value of plant used in the contract

Subscribe on YouTube
payment of cash by contractee under contract is ________." class="read-more button" href="https://exam.pscnotes.com/mcq/the-basis-for-the-payment-of-cash-by-contractee-under-contract-is-________/#more-55814">Detailed SolutionThe basis for the payment of cash by contractee under contract is ________.