The correct answer is: A. cost per good units transferred out.
Total transferred-out cost plus normal spoilage is divided by number of goods units produced to calculate cost per good units transferred out. This is because the cost of goods transferred out is the total cost of the goods that have been completed and transferred to the next department or to finished goods inventory. The cost of normal spoilage is included in the cost of goods transferred out because it is a normal and expected cost of production. The number
64 288 64S117.2 64 74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube