If transferred out total cost is $1850000 and number of good units (produced), then cost per good unit transferred out and completed can be

245.1724
255.1724
278.1724
268.1724

The correct answer is $\boxed{\text{A}}$.

The cost per good unit transferred out and completed is calculated by dividing the total cost of the units transferred out by the

81.2z"/> Subscribe on YouTube
number of good units produced. In this case, the total cost of the units transferred out is $1850000 and the number of good units produced is 7500. Therefore, the cost per good unit transferred out and completed is $1850000 / 7500 = $245.1724.

Option B is incorrect because it is the cost per good unit produced, not the cost per good unit transferred out and completed. Option C is incorrect because it is the cost per good unit transferred out, not the cost per good unit transferred out and completed. Option D is incorrect because it is the cost per good unit in process, not the cost per good unit transferred out and completed.