1. Load curve helps in deciding

[amp_mcq option1=”total installed capacity of the plant” option2=”sizes of the generating units” option3=”operating schedule of generating units” option4=”all of the above” correct=”option4″]

Detailed SolutionLoad curve helps in deciding

2. Which of the following should be used for extinguishing electrical fires?

[amp_mcq option1=”Water” option2=”Carbon tetrachloride fire extinguisher” option3=”Foam type fire extinguisher” option4=”CO2 fire extinguisher” correct=”option4″]

Detailed SolutionWhich of the following should be used for extinguishing electrical fires?

3. The area under a load curve gives

[amp_mcq option1=”average demand” option2=”energy consumed” option3=”maximum demand” option4=”none of the above” correct=”option2″]

Detailed SolutionThe area under a load curve gives

4. Which of the following is the essential requirement of peak load plant?

[amp_mcq option1=”It should run at high speed” option2=”It should produce high voltage” option3=”It should be small in size” option4=”It should be capable of starting quickly” correct=”option4″]

Detailed SolutionWhich of the following is the essential requirement of peak load plant?

5. The expected useful life of an hydroelectric power station is around

[amp_mcq option1=”15 years” option2=”30 years” option3=”60 years” option4=”100 years” correct=”option3″]

Detailed SolutionThe expected useful life of an hydroelectric power station is around

6. Power plant is expected to have the longest life.

[amp_mcq option1=”Steam” option2=”Diesel” option3=”Hydroelectric” option4=”Any of the above” correct=”option3″]

Detailed SolutionPower plant is expected to have the longest life.

7. Which of the following is not necessarily an advantage of interconnecting various power stations?

[amp_mcq option1=”Improved frequency of power supplied” option2=”Reduction in total installed capacity” option3=”Increased reliability” option4=”Economy in operation of plants” correct=”option1″]

Detailed SolutionWhich of the following is not necessarily an advantage of interconnecting various power stations?

8. Generating capacity connected to the bus bars and ready to take load when switched on is known as

[amp_mcq option1=”firm power” option2=”cold reserve” option3=”hot reserve” option4=”spinning reserve” correct=”option4″]

Detailed SolutionGenerating capacity connected to the bus bars and ready to take load when switched on is known as

9. The primary reason for low power factor is supply system is due to installation of

[amp_mcq option1=”induction motors” option2=”synchronous motors” option3=”single phase motors” option4=”d.c. motors” correct=”option1″]

Detailed SolutionThe primary reason for low power factor is supply system is due to installation of

10. Which of the following power plants need the least period for installation ?

[amp_mcq option1=”Thermal power plant” option2=”Diesel power plant” option3=”Nuclear power plant” option4=”Hydro-electric power plant” correct=”option2″]

Detailed SolutionWhich of the following power plants need the least period for installation ?