a flexible budget considers only variable costs but a static budget considers all costs
a flexible budgets allows management latitude in meeting goals, whereas static budget is based on fixed standards
a flexible budget can be prepared for any production level within a relevant range but a static budget is based on one specific level of production
Answer is Wrong!
Answer is Right!
Detailed SolutionThe basic difference between a static budget and flexible budget is that