Megha Health Insurance Scheme (MHIS):
The Megha Health Insurance Scheme (MHIS) is being implemented across the state of Meghalaya by the government. The objective of the scheme is to provide financial aid to all the citizens of the state at the time of hospitalization. The policy period of insurance is only one year but it can be renewed by making payment of the insurance premium.
The State Government is providing a universal health insurance to all citizens of the State under Megha Health Insurance Scheme (MHIS). All the citizens can enroll in the scheme but they have to pay some nominal amount as the enrollment fee to avail the scheme benefits. This scheme is being implemented through New India Assurance Company Ltd.
The state government under the phase 3 of Megha Health Insurance Scheme has been increased to Rs. 2,80,000 for up to 5 members of the family on floater basis. The maximum one time hospitalization for critical care has also been increased to Rs 250000 from Rs 170000. The enrollment fee for MHIS phase 3 is Rs. 50 Rupees and does not have any age limit. The smart cards issued under the scheme can be used to avail free and cashless treatment at all government hospitals and empaneled private health institutions.
New Shillong Township :
This scheme is aimed at taking up Infrastructure-2/”>INFRASTRUCTURE-development/”>Infrastructure Development works at New Shillong Township. To accommodate the future Population of Shillong, proposal for setting up of a new township designed for 2,00,000 population was conceived by the department. An area of 2030 hectares has been identified to the East of the Shillong city. It is proposed to develop the township as a joint venture involving both Government and Private initiative. Government intervention is restricted to acquiring and developing 500 hectares of land while in the remaining areas only the bulk infrastructure will be laid by the Government. As of date,370.26 hectares of land has already been acquired. Detailed Project Report (D.P.R.) of the different sectors like road, power, water supply, sewerage and drainage etc. has been prepared and ready for implementation.
Environmental Improvement Of Urban Slum (E.I.U.S.) :
The Environmental Improvement of Urban slums scheme which is a part of the 20 Point Programme is being implemented in the Slum areas of Shillong, Tura, Jowai, Baghmara, Williamnagar and Nongstoin. The scheme has played a significant and satisfying role in the improvement of slum areas in the above towns. Basic amenities like drains, footpaths, sanitation facilities, drinking water, water supply etc. have been provided under the scheme. The Scheme is being implemented by the Office of the Executive Engineer, Urban Affairs in the respective towns.
Housing For All (Urban) Mission :
The scheme was launched on 25th June 2015 with an objective to provide rehabilitation of slum dwellers with participation of private developers using land as a source, to promote affordable housing for weaker section through credit linked subsidy, to provide affordable housing in PARTNERSHIP with public and private sectors and to provide subsidy for beneficiary-led individual house construction. 10 statutory towns in the State have been included under the programme which include as follows- Shillong Municpal Board(S.M.B.), Shillong Cantonment Board(C.B.), Shillong Urban Agglomeration Area (only Census Towns excluding S.M.B. area),Tura, Jowai, Baghmara, Williamnagar, Resubelpara, Mairang, Nongstoin ,Nongpoh. Currently Demand Survey is being carried out in all the topwns to assess the housing demand and requirement.
Pradhan Mantri Kaushal Vikas Yojana (PMKVY):
Pradhan Mantri Kaushal Vikas Yojana (PMKVY) is a flagship scheme of Narendra Modi government under which Skill development training is provided to youth in different verticals. The government is providing skill training in different Industry verticals through authorized training centers across the country.
As per 23rd March 2017, there are a total of 2150 PMKVY training centers operating across the country for providing skill training to youth. These training centers are operated by different authorized training partners of PM Kaushal Vikas Yojana
44 Lakh Homes Under Pradhan Mantri Awas Yojana:
Pradhan Mantri Awas Yojana – Gramin targets for 2017 has been revised by the central government after the announcement made by PM Narendra Modi in his 31st December Speech. The government has increased the overall number of housing units to be constructed by 1 Crore under the PMAY-G.
The central government has set a target of building 44 Lakh homes under Pradhan Mantri Awas Yojana – Gramin by the end of December 2017. According to the statistics released by Ministry of Rural Development, about 22 Lakh houses have been constructed in rural areas under PMAY-G till 28th January. The ministry will complete the construction of 1 Crore 33 Lakh houses in three years from 2016-17 to 2018-19 which also includes 33 Lakh homes under previous Indira Awas Yojana.
List of Airports Under UDAN Scheme (Udey Desh Ka Aam Nagrik):
UDAN Scheme, the regional air connectivity scheme recently launched by the central government to make the air travel cheaper has started to see the sun of the day. According to industry chamber FICCI, about 44 airports across the country has the potential to execute operations under the scheme.
The list of 44 out of 414 underserved and unserved airports has been prepared based upon geographical, operational and commercial parameters which has potential to be part of regional connectivity scheme UDAN. The report also mentions the list of around 370 potential destinations for the shortlisted airports, including metros, state capitals and important commercial, industrial and tourism centers. Shillong and Tura of Meghalaya is proposed for the Airport under this scheme.
Swachh Bharat Mission :-
This is a newly launched programme of Ministry of Urban Development which was launched on 2nd October 2014 with a target date to achieve all objectives by the 2nd October, 2019. The Mission was also formally launched in the State of Meghalaya on the 2nd October, 2014. 10 statutory towns in the State have been included under the programme which include as follows- Shillong Municpal Board(S.M.B.), Shillong Cantonment Board(C.B.), Shillong Urban Agglomeration Area (only Census Towns excluding S.M.B. area),Tura, Jowai, Baghmara, Williamnagar, Resubelpara, Mairang, Nongstoin ,Nongpoh. The Mission is being implemented by the Municipal Boards in Municipal Towns and the respective Deputy Commissioner in Non-Municipal Towns.,
Meghalaya is a state in northeastern India. It is bordered by Assam to the north, Bangladesh to the south, and the states of Manipur and Nagaland to the east. The capital of Meghalaya is Shillong.
Meghalaya is a mountainous state with a population of over 3 million people. The majority of the population is Khasi, Jaintia, and Garo tribes. The official languages of Meghalaya are Khasi, Garo, and English.
Meghalaya is a beautiful state with a rich culture and history. The state is home to many natural attractions, including waterfalls, forests, and wildlife sanctuaries. Meghalaya is also a popular destination for adventure tourism.
The economy of Meghalaya is based on agriculture, Forestry, and tourism. The state is also home to a number of small industries.
The government of Meghalaya is working to improve the lives of its people by investing in Education, health care, and infrastructure. The government is also working to promote Economic Development and to protect the Environment.
The following are some of the schemes and projects that are being implemented by the government of Meghalaya:
- Agriculture: The government of Meghalaya is working to improve the productivity of agriculture by providing subsidies for seeds, Fertilizers, and other inputs. The government is also working to promote the use of modern agricultural techniques.
- Animal Husbandry: The government of Meghalaya is working to improve the productivity of animal husbandry by providing subsidies for Livestock, feed, and other inputs. The government is also working to promote the use of modern animal husbandry techniques.
- Bamboo Development: The government of Meghalaya is working to promote the development of the bamboo industry by providing subsidies for bamboo cultivation, processing, and Marketing. The government is also working to promote the use of bamboo in construction, furniture, and other products.
- Biomass/”>Biomass Power Generation: The government of Meghalaya is working to promote the development of biomass power generation by providing subsidies for biomass power Plants. The government is also working to promote the use of biomass for cooking and heating.
- Capacity Building: The government of Meghalaya is working to improve the capacity of its employees by providing Training and Development programs. The government is also working to improve the infrastructure of its offices and buildings.
- Child Development: The government of Meghalaya is working to improve the lives of children by providing education, health care, and Nutrition. The government is also working to protect children from abuse and neglect.
- Climate Change Adaptation: The government of Meghalaya is working to adapt to the effects of Climate Change by implementing measures such as afforestation, Watershed Management, and disaster risk reduction.
- Community Development: The government of Meghalaya is working to improve the lives of people in rural areas by providing infrastructure, education, health care, and other Services. The government is also working to promote community participation in development.
- Drinking Water Supply: The government of Meghalaya is working to provide Safe drinking water to all its citizens by implementing measures such as water treatment plants, pipelines, and hand pumps.
- Education: The government of Meghalaya is working to improve the quality of education by providing free education to all children up to the age of 14. The government is also working to improve the infrastructure of schools and colleges.
- EMPLOYMENT Generation: The government of Meghalaya is working to create employment opportunities by promoting the Development Of Industries and by providing training and support to entrepreneurs.
- Energy Efficiency: The government of Meghalaya is working to improve energy efficiency by implementing measures such as energy audits, energy-efficient appliances, and RENEWABLE ENERGY.
- Environment Protection: The government of Meghalaya is working to protect the environment by implementing measures such as afforestation, watershed management, and pollution control.
- Food Processing: The government of Meghalaya is working to promote the development of the food processing industry by providing subsidies for food processing plants and by promoting the use of local produce.
- Health: The government of Meghalaya is working to improve the health of its citizens by providing free health care to all children up to the age of 18. The government is also working to improve the infrastructure of hospitals and clinics.
- Housing: The government of Meghalaya is working to provide affordable housing to all its citizens by implementing measures such as low-cost housing schemes and subsidies for housing loans.
- Infrastructure Development: The government of Meghalaya is working to improve the infrastructure of the state by implementing measures such as roads, bridges, airports, and power plants.
- Irrigation: The government of Meghalaya is working to improve irrigation facilities by implementing measures such as Dams, canals, and tube wells.
- IT & ITeS: The government of Meghalaya is working to promote the development of the IT and ITeS industry by providing subsidies for IT companies and by promoting the use of IT in government services.
Here are some frequently asked questions and short answers about Meghalaya Schemes & Projects:
- What are the different types of schemes and projects in Meghalaya?
There are many different types of schemes and projects in Meghalaya, including:
- Agriculture and allied sectors: These schemes and projects focus on improving agricultural productivity and incomes, as well as developing the rural economy.
- Education: These schemes and projects focus on improving access to quality education, as well as developing the skills of the workforce.
- Health: These schemes and projects focus on improving access to quality healthcare, as well as reducing POVERTY and Malnutrition.
- Infrastructure: These schemes and projects focus on developing infrastructure, such as roads, bridges, and power plants.
-
Social welfare: These schemes and projects focus on providing social assistance to the poor and vulnerable, such as pensions, scholarships, and food subsidies.
-
Who are the beneficiaries of these schemes and projects?
The beneficiaries of these schemes and projects are the people of Meghalaya, including:
- Farmers: Farmers are the primary beneficiaries of agriculture and allied sectors schemes and projects. These schemes and projects help to improve agricultural productivity and incomes, as well as develop the rural economy.
- Students: Students are the primary beneficiaries of education schemes and projects. These schemes and projects help to improve access to quality education, as well as develop the skills of the workforce.
- Patients: Patients are the primary beneficiaries of health schemes and projects. These schemes and projects help to improve access to quality healthcare, as well as reduce poverty and malnutrition.
- Citizens: Citizens are the primary beneficiaries of infrastructure schemes and projects. These schemes and projects help to develop infrastructure, such as roads, bridges, and power plants.
-
Poor and vulnerable: The poor and vulnerable are the primary beneficiaries of social welfare schemes and projects. These schemes and projects help to provide social assistance to the poor and vulnerable, such as pensions, scholarships, and food subsidies.
-
How are these schemes and projects funded?
These schemes and projects are funded by the Government of Meghalaya, as well as by the central government and international donors.
- What are the challenges faced in implementing these schemes and projects?
There are many challenges faced in implementing these schemes and projects, including:
- Lack of coordination: There is often a lack of coordination between the different government departments and agencies involved in implementing these schemes and projects. This can lead to delays and inefficiencies.
- Lack of capacity: There is often a lack of capacity among the government officials and staff responsible for implementing these schemes and projects. This can lead to poor implementation and outcomes.
- Corruption: Corruption is a major problem in Meghalaya, and it can hinder the implementation of these schemes and projects.
- Lack of transparency: There is often a lack of transparency in the implementation of these schemes and projects. This can lead to suspicion and mistrust among the people.
-
Lack of accountability: There is often a lack of accountability among the government officials and staff responsible for implementing these schemes and projects. This can lead to poor implementation and outcomes.
-
What are the successes of these schemes and projects?
Despite the challenges, there have been some successes in implementing these schemes and projects. For example, the agriculture and allied sectors schemes and projects have helped to improve agricultural productivity and incomes. The education schemes and projects have helped to improve access to quality education. The health schemes and projects have helped to improve access to quality healthcare. The infrastructure schemes and projects have helped to develop infrastructure, such as roads, bridges, and power plants. The social welfare schemes and projects have helped to provide social assistance to the poor and vulnerable.
- What are the lessons learned from these schemes and projects?
The following lessons have been learned from the implementation of these schemes and projects:
- It is important to have strong coordination between the different government departments and agencies involved in implementing these schemes and projects. This can help to avoid delays and inefficiencies.
- It is important to build capacity among the government officials and staff responsible for implementing these schemes and projects. This can help to ensure that the schemes and projects are implemented effectively.
- It is important to address the problem of corruption. Corruption can hinder the implementation of these schemes and projects.
- It is important to ensure transparency in the implementation of these schemes and projects. This can help to build trust and confidence among the people.
- It is important to ensure accountability among the government officials and staff responsible for implementing these schemes and projects. This can help to ensure that the schemes and projects are implemented effectively.
-
Which of the following is not a state in India?
(A) Meghalaya
(B) Manipur
(C) Mizoram
(D) Nagaland -
The capital of Meghalaya is:
(A) Shillong
(B) Tura
(C) Jowai
(D) Nongstoin -
The Official Language of Meghalaya is:
(A) Khasi
(B) Garo
(C) Jaintia
(D) English -
The Population of Meghalaya is:
(A) 3,116,000
(B) 3,148,000
(C) 3,179,000
(D) 3,211,000 -
The Literacy rate of Meghalaya is:
(A) 75.6%
(B) 77.2%
(C) 78.8%
(D) 80.4% -
The main religion of Meghalaya is:
(A) Christianity
(B) Hinduism-2/”>Hinduism
(C) Islam
(D) Buddhism-2/”>Buddhism -
The chief minister of Meghalaya is:
(A) Conrad Sangma
(B) Mukul Sangma
(C) P.A. Sangma
(D) D.D. Lapang -
The Meghalaya Legislative Assembly has:
(A) 60 members
(B) 62 members
(C) 64 members
(D) 66 members -
The Meghalaya High Court is located in:
(A) Shillong
(B) Tura
(C) Jowai
(D) Nongstoin -
The Meghalaya State Animal is:
(A) Clouded Leopard
(B) Red Panda
(C) Asiatic Elephant
(D) Royal Bengal Tiger -
The Meghalaya State Bird is:
(A) Wreathed Hornbill
(B) Great Hornbill
(C) Rufous-necked Hornbill
(D) Helmeted Hornbill -
The Meghalaya State Flower is:
(A) Khasi Orchid
(B) Blue Vanda
(C) White Vanda
(D) Yellow Vanda -
The Meghalaya State Tree is:
(A) Hollong
(B) Semul
(C) Champak
(D) Sal -
The Meghalaya State Fruit is:
(A) Orange
(B) Pineapple
(C) Mango
(D) Banana -
The Meghalaya State Motto is:
(A) Unity in Diversity
(B) Peace and Progress
(C) Prosperity and Harmony
(D) Progress and Development -
The Meghalaya State Song is:
(A) “Meghalaya”
(B) “Asong Ki Jadukata”
(C) “U Tirot Sing Syiem”
(D) “Nongkrem Dance” -
The Meghalaya State Emblem is:
(A) A Khasi warrior with a sword and shield
(B) A Garo warrior with a bow and arrow
(C) A Jaintia warrior with a spear and shield
(D) A Khasi woman with a basket of rice -
The Meghalaya State Flag is:
(A) A blue flag with a white star in the center
(B) A green flag with a white star in the center
(C) A red flag with a white star in the center
(D) A yellow flag with a white star in the center -
The Meghalaya State Bird Sanctuary is located in:
(A) Nokrek National Park
(B) Balpakram National Park
(C) Mawphlang Wildlife Sanctuary
(D) Nongkhyllem Wildlife Sanctuary -
The Meghalaya State Zoo is located in:
(A) Shillong
(B) Tura
(C) Jowai
(D) Nongstoin -
The Meghalaya State Museum is located in:
(A) Shillong
(B) Tura
(C) Jowai
(D) Nongstoin -
The Meghalaya State Art Gallery is located in:
(A) Shillong
(B) Tura
(C) Jowai
(D) Nongstoin -
The Meghalaya State Handicrafts Emporium is located in:
(A) Shil