{"id":88014,"date":"2025-06-01T06:59:40","date_gmt":"2025-06-01T06:59:40","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=88014"},"modified":"2025-06-01T06:59:40","modified_gmt":"2025-06-01T06:59:40","slug":"which-of-the-following-schemes-is-are-included-under-bharatmala-pari","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/","title":{"rendered":"Which of the following scheme(s) is\/are included under Bharatmala Pari"},"content":{"rendered":"<p>Which of the following scheme(s) is\/are included under Bharatmala Pariyojana ?<\/p>\n<ul>\n<li>1. Develop the road connectivity to border areas<\/li>\n<li>2. Development of coastal roads<\/li>\n<li>3. Improvement in the efficiency of National Corridors<\/li>\n<\/ul>\n<p>Select the correct answer using the code given below :<\/p>\n<p>[amp_mcq option1=&#8221;1 only&#8221; option2=&#8221;3 only&#8221; option3=&#8221;2 and 3 only&#8221; option4=&#8221;1, 2 and 3&#8243; correct=&#8221;option4&#8243;]<\/p>\n<div class=\"psc-box-pyq-exam-year-detail\">\n<div class=\"pyq-exam\">\n<div class=\"psc-heading\">This question was previously asked in<\/div>\n<div class=\"psc-title line-ellipsis\">UPSC NDA-1 &#8211; 2023<\/div>\n<\/div>\n<div class=\"pyq-exam-psc-buttons\"><a href=\"\/pyq\/pyq-upsc-nda-1-2023.pdf\" target=\"_blank\" class=\"psc-pdf-button\" rel=\"noopener\">Download PDF<\/a><a href=\"\/pyq-upsc-nda-1-2023\" target=\"_blank\" class=\"psc-attempt-button\" rel=\"noopener\">Attempt Online<\/a><\/div>\n<\/div>\n<section id=\"pyq-correct-answer\">\nBharatmala Pariyojana is an ambitious umbrella program of the Government of India for highways development, focusing on optimising the efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps. It encompasses various components aimed at improving the overall road network.<br \/>\n<\/section>\n<section id=\"pyq-key-points\">\nThe stated objectives\/components of Bharatmala Pariyojana include:<br \/>\n1. Development of Economic Corridors (around 9,000 km).<br \/>\n2. Development of Inter Corridors and Feeder Routes (around 6,000 km).<br \/>\n3. National Corridor Efficiency Improvement (around 5,000 km, decongestion of existing corridors).<br \/>\n4. Border Road Development and International Connectivity Roads (around 3,400 km).<br \/>\n5. Coastal Road Development and Port Connectivity Roads (around 2,000 km).<br \/>\n6. Development of Greenfield Expressways (around 800 km).<br \/>\n<\/section>\n<section id=\"pyq-additional-information\">\nAll three points mentioned in the question (1. Develop the road connectivity to border areas, 2. Development of coastal roads, 3. Improvement in the efficiency of National Corridors) are explicit components or objectives of the Bharatmala Pariyojana as outlined by the Ministry of Road Transport and Highways, Government of India.<br \/>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Which of the following scheme(s) is\/are included under Bharatmala Pariyojana ? 1. Develop the road connectivity to border areas 2. Development of coastal roads 3. Improvement in the efficiency of National Corridors Select the correct answer using the code given below : [amp_mcq option1=&#8221;1 only&#8221; option2=&#8221;3 only&#8221; option3=&#8221;2 and 3 only&#8221; option4=&#8221;1, 2 and 3&#8243; &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"Which of the following scheme(s) is\/are included under Bharatmala Pari\" class=\"read-more button\" href=\"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/#more-88014\">Detailed Solution<span class=\"screen-reader-text\">Which of the following scheme(s) is\/are included under Bharatmala Pari<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1093],"tags":[1105,1120,1386],"class_list":["post-88014","post","type-post","status-publish","format-standard","hentry","category-upsc-nda-1","tag-1105","tag-economic-development","tag-tertiary-sector","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Which of the following scheme(s) is\/are included under Bharatmala Pari<\/title>\n<meta name=\"description\" content=\"Bharatmala Pariyojana is an ambitious umbrella program of the Government of India for highways development, focusing on optimising the efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps. It encompasses various components aimed at improving the overall road network. The stated objectives\/components of Bharatmala Pariyojana include: 1. Development of Economic Corridors (around 9,000 km). 2. Development of Inter Corridors and Feeder Routes (around 6,000 km). 3. National Corridor Efficiency Improvement (around 5,000 km, decongestion of existing corridors). 4. Border Road Development and International Connectivity Roads (around 3,400 km). 5. Coastal Road Development and Port Connectivity Roads (around 2,000 km). 6. Development of Greenfield Expressways (around 800 km).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Which of the following scheme(s) is\/are included under Bharatmala Pari\" \/>\n<meta property=\"og:description\" content=\"Bharatmala Pariyojana is an ambitious umbrella program of the Government of India for highways development, focusing on optimising the efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps. It encompasses various components aimed at improving the overall road network. The stated objectives\/components of Bharatmala Pariyojana include: 1. Development of Economic Corridors (around 9,000 km). 2. Development of Inter Corridors and Feeder Routes (around 6,000 km). 3. National Corridor Efficiency Improvement (around 5,000 km, decongestion of existing corridors). 4. Border Road Development and International Connectivity Roads (around 3,400 km). 5. Coastal Road Development and Port Connectivity Roads (around 2,000 km). 6. Development of Greenfield Expressways (around 800 km).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-01T06:59:40+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Which of the following scheme(s) is\/are included under Bharatmala Pari","description":"Bharatmala Pariyojana is an ambitious umbrella program of the Government of India for highways development, focusing on optimising the efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps. It encompasses various components aimed at improving the overall road network. The stated objectives\/components of Bharatmala Pariyojana include: 1. Development of Economic Corridors (around 9,000 km). 2. Development of Inter Corridors and Feeder Routes (around 6,000 km). 3. National Corridor Efficiency Improvement (around 5,000 km, decongestion of existing corridors). 4. Border Road Development and International Connectivity Roads (around 3,400 km). 5. Coastal Road Development and Port Connectivity Roads (around 2,000 km). 6. Development of Greenfield Expressways (around 800 km).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/","og_locale":"en_US","og_type":"article","og_title":"Which of the following scheme(s) is\/are included under Bharatmala Pari","og_description":"Bharatmala Pariyojana is an ambitious umbrella program of the Government of India for highways development, focusing on optimising the efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps. It encompasses various components aimed at improving the overall road network. The stated objectives\/components of Bharatmala Pariyojana include: 1. Development of Economic Corridors (around 9,000 km). 2. Development of Inter Corridors and Feeder Routes (around 6,000 km). 3. National Corridor Efficiency Improvement (around 5,000 km, decongestion of existing corridors). 4. Border Road Development and International Connectivity Roads (around 3,400 km). 5. Coastal Road Development and Port Connectivity Roads (around 2,000 km). 6. Development of Greenfield Expressways (around 800 km).","og_url":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2025-06-01T06:59:40+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/","url":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/","name":"Which of the following scheme(s) is\/are included under Bharatmala Pari","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2025-06-01T06:59:40+00:00","dateModified":"2025-06-01T06:59:40+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"description":"Bharatmala Pariyojana is an ambitious umbrella program of the Government of India for highways development, focusing on optimising the efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps. It encompasses various components aimed at improving the overall road network. The stated objectives\/components of Bharatmala Pariyojana include: 1. Development of Economic Corridors (around 9,000 km). 2. Development of Inter Corridors and Feeder Routes (around 6,000 km). 3. National Corridor Efficiency Improvement (around 5,000 km, decongestion of existing corridors). 4. Border Road Development and International Connectivity Roads (around 3,400 km). 5. Coastal Road Development and Port Connectivity Roads (around 2,000 km). 6. Development of Greenfield Expressways (around 800 km).","breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/which-of-the-following-schemes-is-are-included-under-bharatmala-pari\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"UPSC NDA-1","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/upsc-nda-1\/"},{"@type":"ListItem","position":3,"name":"Which of the following scheme(s) is\/are included under Bharatmala Pari"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/88014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=88014"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/88014\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=88014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=88014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=88014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}