{"id":8470,"date":"2024-04-15T03:01:07","date_gmt":"2024-04-15T03:01:07","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=8470"},"modified":"2024-04-15T03:01:07","modified_gmt":"2024-04-15T03:01:07","slug":"in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/","title":{"rendered":"In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;Activity of an excavation of a footing&#8221; option2=&#8221;Activity of an excavation which starts at event No. 1 and ends at even No. 2&#8243; option3=&#8221;Activity of excavation which takes 8 units of time&#8221; option4=&#8221;None of these&#8221; correct=&#8221;option1&#8243;]<!--more--><\/p>\n<p>The correct answer is: A. Activity of an excavation of a footing.<\/p>\n<p>The network of a project represents the activities that need to be completed in order to finish the project. The activities are represented by arrows, and the events are represented by circles. The arrows show the order in which the activities need to be completed. The events show the points in time when the activities are completed.<\/p>\n<p>In the given figure, the activity of excavation of a footing is represented by the arrow from event No. 1 to event No. 2. The activity starts at event No. 1 and ends at event No. 2. The activity takes 8 units of time.<\/p>\n<p>Option B is incorrect because the activity of excavation of a footing does not start at event No. 1 and end at event No. 2. The activity starts at event No. 1 and ends at event No. 2.<\/p>\n<p>Option C is incorrect because the activity of excavation of a footing does not take 8 units of time. The activity takes 8 units of time.<\/p>\n<p>Option D is incorrect because the activity of excavation of a footing is represented in the network of the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;Activity of an excavation of a footing&#8221; option2=&#8221;Activity of an excavation which starts at event No. 1 and ends at even No. 2&#8243; option3=&#8221;Activity of excavation which takes 8 units of time&#8221; option4=&#8221;None of these&#8221; correct=&#8221;option1&#8243;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[655],"tags":[],"class_list":["post-8470","post","type-post","status-publish","format-standard","hentry","category-construction-planning-and-management","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these\" \/>\n<meta property=\"og:description\" content=\"[amp_mcq option1=&#8221;Activity of an excavation of a footing&#8221; option2=&#8221;Activity of an excavation which starts at event No. 1 and ends at even No. 2&#8243; option3=&#8221;Activity of excavation which takes 8 units of time&#8221; option4=&#8221;None of these&#8221; correct=&#8221;option1&#8243;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-15T03:01:07+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/","og_locale":"en_US","og_type":"article","og_title":"In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these","og_description":"[amp_mcq option1=&#8221;Activity of an excavation of a footing&#8221; option2=&#8221;Activity of an excavation which starts at event No. 1 and ends at even No. 2&#8243; option3=&#8221;Activity of excavation which takes 8 units of time&#8221; option4=&#8221;None of these&#8221; correct=&#8221;option1&#8243;]","og_url":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-04-15T03:01:07+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/","url":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/","name":"In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-04-15T03:01:07+00:00","dateModified":"2024-04-15T03:01:07+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/in-the-given-figure-the-network-of-a-project-represents-a-activity-of-an-excavation-of-a-footing-b-activity-of-an-excavation-which-starts-at-event-no-1-and-ends-at-even-no-2-c-activity-of-excava\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"Civil engineering","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/"},{"@type":"ListItem","position":4,"name":"Construction planning and management","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/construction-planning-and-management\/"},{"@type":"ListItem","position":5,"name":"In the given figure, the network of a project represents A. Activity of an excavation of a footing B. Activity of an excavation which starts at event No. 1 and ends at even No. 2 C. Activity of excavation which takes 8 units of time D. None of these"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/8470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=8470"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/8470\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=8470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=8470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=8470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}