{"id":8431,"date":"2024-04-15T03:00:33","date_gmt":"2024-04-15T03:00:33","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=8431"},"modified":"2024-04-15T03:00:33","modified_gmt":"2024-04-15T03:00:33","slug":"consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/","title":{"rendered":"Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;1, 2, 4, 3, 5&#8243; option2=&#8221;1, 3, 2, 4, 5&#8243; option3=&#8221;1, 2, 3, 4, 5&#8243; option4=&#8221;1, 3, 4, 2, 5&#8243; correct=&#8221;option2&#8243;]<!--more--><\/p>\n<p>The correct sequence of these operations in tunnel construction is:<\/p>\n<ol>\n<li>Drilling<\/li>\n<li>Blasting<\/li>\n<li>Mucking<\/li>\n<li>Placing steel<\/li>\n<li>Placing concrete<\/li>\n<\/ol>\n<p>Drilling is the first step in tunnel construction. The purpose of drilling is to create a hole in the ground that can be used for the tunnel. The type of drill used will depend on the type of ground that is being drilled through.<\/p>\n<p>Blasting is the second step in tunnel construction. The purpose of blasting is to break up the rock or soil that has been drilled. The type of explosive used will depend on the type of ground that is being blasted through.<\/p>\n<p>Mucking is the third step in tunnel construction. The purpose of mucking is to remove the rock or soil that has been blasted. The muck is usually removed by a mucking machine.<\/p>\n<p>Placing steel is the fourth step in tunnel construction. The purpose of placing steel is to provide support for the tunnel. The type of steel used will depend on the type of ground that is being tunneled through.<\/p>\n<p>Placing concrete is the fifth and final step in tunnel construction. The purpose of placing concrete is to provide a watertight and durable lining for the tunnel. The type of concrete used will depend on the type of ground that is being tunneled through.<\/p>\n<p>It is important to note that the sequence of these operations may vary depending on the specific tunnel being constructed. However, this is the general sequence of operations that is followed in most tunnel construction projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;1, 2, 4, 3, 5&#8243; option2=&#8221;1, 3, 2, 4, 5&#8243; option3=&#8221;1, 2, 3, 4, 5&#8243; option4=&#8221;1, 3, 4, 2, 5&#8243; correct=&#8221;option2&#8243;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[655],"tags":[],"class_list":["post-8431","post","type-post","status-publish","format-standard","hentry","category-construction-planning-and-management","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5\" \/>\n<meta property=\"og:description\" content=\"[amp_mcq option1=&#8221;1, 2, 4, 3, 5&#8243; option2=&#8221;1, 3, 2, 4, 5&#8243; option3=&#8221;1, 2, 3, 4, 5&#8243; option4=&#8221;1, 3, 4, 2, 5&#8243; correct=&#8221;option2&#8243;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-15T03:00:33+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/","og_locale":"en_US","og_type":"article","og_title":"Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5","og_description":"[amp_mcq option1=&#8221;1, 2, 4, 3, 5&#8243; option2=&#8221;1, 3, 2, 4, 5&#8243; option3=&#8221;1, 2, 3, 4, 5&#8243; option4=&#8221;1, 3, 4, 2, 5&#8243; correct=&#8221;option2&#8243;]","og_url":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-04-15T03:00:33+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/","url":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/","name":"Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-04-15T03:00:33+00:00","dateModified":"2024-04-15T03:00:33+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-a-1-2-4-3-5-b-1-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"Civil engineering","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/"},{"@type":"ListItem","position":4,"name":"Construction planning and management","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/construction-planning-and-management\/"},{"@type":"ListItem","position":5,"name":"Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is A. 1, 2, 4, 3, 5 B. 1, 3, 2, 4, 5 C. 1, 2, 3, 4, 5 D. 1, 3, 4, 2, 5"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/8431","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=8431"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/8431\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=8431"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=8431"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=8431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}