{"id":6284,"date":"2024-04-15T02:26:31","date_gmt":"2024-04-15T02:26:31","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=6284"},"modified":"2024-04-15T02:26:31","modified_gmt":"2024-04-15T02:26:31","slug":"for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/","title":{"rendered":"For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;i, ii, iii, iv, v&#8221; option2=&#8221;v, iv, iii, ii, i&#8221; option3=&#8221;ii, i, iii, v, iv&#8221; option4=&#8221;iii, ii, v, i, iv&#8221; correct=&#8221;option4&#8243;]<!--more--><\/p>\n<p>The correct sequence is:<\/p>\n<ol>\n<li>Excavation of the soil upto required depth<\/li>\n<li>Ramming the foundation bed<\/li>\n<li>Laying the reinforcement over the foundation bed<\/li>\n<li>Pouring the cement concrete over the reinforcement<\/li>\n<li>Curing the cement concrete placed over reinforcement<\/li>\n<\/ol>\n<p>Explanation:<\/p>\n<ol>\n<li>The first step is to excavate the soil to the required depth. This will create a hole in the ground that is large enough to accommodate the raft foundation.<\/li>\n<li>The next step is to ram the foundation bed. This is done by compacting the soil at the bottom of the hole to create a solid foundation for the raft foundation.<\/li>\n<li>Once the foundation bed is in place, the reinforcement can be laid. The reinforcement is a network of steel bars that will help to strengthen the raft foundation.<\/li>\n<li>The next step is to pour the cement concrete over the reinforcement. The cement concrete will harden and create a solid foundation for the structure.<\/li>\n<li>The final step is to cure the cement concrete. This is done by keeping the cement concrete moist for a period of time. This will help the cement concrete to harden and reach its full strength.<\/li>\n<\/ol>\n<p>The other options are incorrect because they do not follow the correct sequence of steps.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;i, ii, iii, iv, v&#8221; option2=&#8221;v, iv, iii, ii, i&#8221; option3=&#8221;ii, i, iii, v, iv&#8221; option4=&#8221;iii, ii, v, i, iv&#8221; correct=&#8221;option4&#8243;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[643],"tags":[],"class_list":["post-6284","post","type-post","status-publish","format-standard","hentry","category-building-construction","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv\" \/>\n<meta property=\"og:description\" content=\"[amp_mcq option1=&#8221;i, ii, iii, iv, v&#8221; option2=&#8221;v, iv, iii, ii, i&#8221; option3=&#8221;ii, i, iii, v, iv&#8221; option4=&#8221;iii, ii, v, i, iv&#8221; correct=&#8221;option4&#8243;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-15T02:26:31+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/","og_locale":"en_US","og_type":"article","og_title":"For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv","og_description":"[amp_mcq option1=&#8221;i, ii, iii, iv, v&#8221; option2=&#8221;v, iv, iii, ii, i&#8221; option3=&#8221;ii, i, iii, v, iv&#8221; option4=&#8221;iii, ii, v, i, iv&#8221; correct=&#8221;option4&#8243;]","og_url":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-04-15T02:26:31+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/","url":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/","name":"For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-04-15T02:26:31+00:00","dateModified":"2024-04-15T02:26:31+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/for-providing-a-raft-foundation-the-following-activities-are-involved-i-ramming-the-foundation-bed-ii-excavation-of-the-soil-upto-required-depth-iii-laying-the-reinforcement-over-the-foundation-be\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"Civil engineering","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/"},{"@type":"ListItem","position":4,"name":"Building construction","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/building-construction\/"},{"@type":"ListItem","position":5,"name":"For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is A. i, ii, iii, iv, v B. v, iv, iii, ii, i C. ii, i, iii, v, iv D. iii, ii, v, i, iv"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6284","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=6284"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6284\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=6284"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=6284"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=6284"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}