{"id":6232,"date":"2024-04-15T02:25:47","date_gmt":"2024-04-15T02:25:47","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=6232"},"modified":"2024-04-15T02:25:47","modified_gmt":"2024-04-15T02:25:47","slug":"for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/","title":{"rendered":"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;A base course is prepared as in cement concrete flooring&#8221; option2=&#8221;A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling&#8221; option3=&#8221;Glass strips are driven into the layer according to the pattern required&#8221; option4=&#8221;After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material&#8221; correct=&#8221;option3&#8243;]<!--more--><\/p>\n<p>The correct answer is: C. Glass strips are driven into the layer according to the pattern required.<\/p>\n<p>A terrazzo floor is a type of flooring that is made from a mixture of cement, marble chips, and other aggregates. It is a durable and attractive flooring option that can be used in a variety of settings.<\/p>\n<p>To construct a terrazzo floor, the following steps are typically followed:<\/p>\n<ol>\n<li>A base course is prepared as in cement concrete flooring. This involves excavating the ground to the desired depth and then compacting the soil. A layer of sand or gravel is then added and compacted.<\/li>\n<li>A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling. The concrete should be allowed to dry completely before proceeding to the next step.<\/li>\n<li>Glass strips are embedded into the concrete according to the desired pattern. The strips should be flush with the surface of the concrete.<\/li>\n<li>A terrazzo topping is applied to the concrete. This topping is a mixture of cement, marble chips, and other aggregates. It is applied in a thin layer and then trowelled smooth.<\/li>\n<li>The terrazzo topping is allowed to dry completely. Once it is dry, it is polished to a high shine.<\/li>\n<\/ol>\n<p>The statement &#8220;Glass strips are driven into the layer according to the pattern required&#8221; is incorrect because glass strips are embedded into the concrete, not driven into it.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;A base course is prepared as in cement concrete flooring&#8221; option2=&#8221;A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling&#8221; option3=&#8221;Glass strips are driven into the layer according to the pattern required&#8221; option4=&#8221;After final grinding is over, &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material\" class=\"read-more button\" href=\"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/#more-6232\">Detailed Solution<span class=\"screen-reader-text\">For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[643],"tags":[],"class_list":["post-6232","post","type-post","status-publish","format-standard","hentry","category-building-construction","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material\" \/>\n<meta property=\"og:description\" content=\"[amp_mcq option1=&#8221;A base course is prepared as in cement concrete flooring&#8221; option2=&#8221;A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling&#8221; option3=&#8221;Glass strips are driven into the layer according to the pattern required&#8221; option4=&#8221;After final grinding is over, ... Detailed SolutionFor constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-15T02:25:47+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/","og_locale":"en_US","og_type":"article","og_title":"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material","og_description":"[amp_mcq option1=&#8221;A base course is prepared as in cement concrete flooring&#8221; option2=&#8221;A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling&#8221; option3=&#8221;Glass strips are driven into the layer according to the pattern required&#8221; option4=&#8221;After final grinding is over, ... Detailed SolutionFor constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material","og_url":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-04-15T02:25:47+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/","url":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/","name":"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-04-15T02:25:47+00:00","dateModified":"2024-04-15T02:25:47+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/for-constructing-a-terrazzo-floor-pick-up-the-incorrect-statement-from-the-following-a-a-base-course-is-prepared-as-in-cement-concrete-flooring-b-a-32-mm-thick-layer-of-cement-concrete-1-2-4\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"Civil engineering","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/"},{"@type":"ListItem","position":4,"name":"Building construction","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/building-construction\/"},{"@type":"ListItem","position":5,"name":"For constructing a terrazzo floor, Pick up the incorrect statement from the following: A. A base course is prepared as in cement concrete flooring B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling C. Glass strips are driven into the layer according to the pattern required D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=6232"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6232\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=6232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=6232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=6232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}