{"id":6092,"date":"2024-04-15T02:23:47","date_gmt":"2024-04-15T02:23:47","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=6092"},"modified":"2024-04-15T02:23:47","modified_gmt":"2024-04-15T02:23:47","slug":"the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/","title":{"rendered":"The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;1 cm per metre length&#8221; option2=&#8221;2 cm per metre length&#8221; option3=&#8221;4 cm per metre length&#8221; option4=&#8221;5 cm per metre length&#8221; correct=&#8221;option1&#8243;]<!--more--><\/p>\n<p>The correct answer is A. 1 cm per metre length.<\/p>\n<p>A precast concrete pile is a type of foundation that is made from concrete that has been cast in a mold and then transported to the site where it will be used. The taper of a precast concrete pile is the difference in the diameter of the pile at the top and the bottom. The taper is typically specified by the manufacturer of the pile and is designed to provide the necessary strength and stability for the pile.<\/p>\n<p>The taper of a precast concrete pile should not be more than 1 cm per metre length. This is because a greater taper could result in the pile being weaker and less stable. Additionally, a greater taper could make it more difficult to install the pile.<\/p>\n<p>The other options are incorrect because they are greater than the maximum recommended taper of 1 cm per metre length.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;1 cm per metre length&#8221; option2=&#8221;2 cm per metre length&#8221; option3=&#8221;4 cm per metre length&#8221; option4=&#8221;5 cm per metre length&#8221; correct=&#8221;option1&#8243;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[643],"tags":[],"class_list":["post-6092","post","type-post","status-publish","format-standard","hentry","category-building-construction","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length\" \/>\n<meta property=\"og:description\" content=\"[amp_mcq option1=&#8221;1 cm per metre length&#8221; option2=&#8221;2 cm per metre length&#8221; option3=&#8221;4 cm per metre length&#8221; option4=&#8221;5 cm per metre length&#8221; correct=&#8221;option1&#8243;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-15T02:23:47+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/","og_locale":"en_US","og_type":"article","og_title":"The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length","og_description":"[amp_mcq option1=&#8221;1 cm per metre length&#8221; option2=&#8221;2 cm per metre length&#8221; option3=&#8221;4 cm per metre length&#8221; option4=&#8221;5 cm per metre length&#8221; correct=&#8221;option1&#8243;]","og_url":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-04-15T02:23:47+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/","url":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/","name":"The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-04-15T02:23:47+00:00","dateModified":"2024-04-15T02:23:47+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/the-taper-of-precast-concrete-pile-should-not-be-more-than-a-1-cm-per-metre-length-b-2-cm-per-metre-length-c-4-cm-per-metre-length-d-5-cm-per-metre-length\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"Civil engineering","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/"},{"@type":"ListItem","position":4,"name":"Building construction","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/building-construction\/"},{"@type":"ListItem","position":5,"name":"The taper of precast concrete pile should not be more than A. 1 cm per metre length B. 2 cm per metre length C. 4 cm per metre length D. 5 cm per metre length"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=6092"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6092\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=6092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=6092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=6092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}