{"id":6083,"date":"2024-04-15T02:23:40","date_gmt":"2024-04-15T02:23:40","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=6083"},"modified":"2024-04-15T02:23:40","modified_gmt":"2024-04-15T02:23:40","slug":"depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/","title":{"rendered":"Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;10 cm&#8221; option2=&#8221;15 cm&#8221; option3=&#8221;Equal to its projection beyond wall base&#8221; option4=&#8221;Less than its projection beyond wall base&#8221; correct=&#8221;option3&#8243;]<!--more--><\/p>\n<p>The correct answer is: C. Equal to its projection beyond wall base.<\/p>\n<p>A lean concrete bed is a layer of concrete that is placed at the bottom of a wall footing. It is used to distribute the load of the wall evenly over the soil. The depth of the lean concrete bed should be equal to its projection beyond the wall base. This ensures that the load of the wall is evenly distributed and that the wall footing is stable.<\/p>\n<p>Option A is incorrect because 10 cm is not a common depth for a lean concrete bed. Option B is incorrect because 15 cm is also not a common depth for a lean concrete bed. Option D is incorrect because the lean concrete bed should be equal to its projection beyond the wall base, not less than it.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;10 cm&#8221; option2=&#8221;15 cm&#8221; option3=&#8221;Equal to its projection beyond wall base&#8221; option4=&#8221;Less than its projection beyond wall base&#8221; correct=&#8221;option3&#8243;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[643],"tags":[],"class_list":["post-6083","post","type-post","status-publish","format-standard","hentry","category-building-construction","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base\" \/>\n<meta property=\"og:description\" content=\"[amp_mcq option1=&#8221;10 cm&#8221; option2=&#8221;15 cm&#8221; option3=&#8221;Equal to its projection beyond wall base&#8221; option4=&#8221;Less than its projection beyond wall base&#8221; correct=&#8221;option3&#8243;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-15T02:23:40+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/","og_locale":"en_US","og_type":"article","og_title":"Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base","og_description":"[amp_mcq option1=&#8221;10 cm&#8221; option2=&#8221;15 cm&#8221; option3=&#8221;Equal to its projection beyond wall base&#8221; option4=&#8221;Less than its projection beyond wall base&#8221; correct=&#8221;option3&#8243;]","og_url":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-04-15T02:23:40+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/","url":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/","name":"Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-04-15T02:23:40+00:00","dateModified":"2024-04-15T02:23:40+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/depth-of-lean-concrete-bed-placed-at-the-bottom-of-a-wall-footing-is-kept-a-10-cm-b-15-cm-c-equal-to-its-projection-beyond-wall-base-d-less-than-its-projection-beyond-wall-base\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"Civil engineering","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/"},{"@type":"ListItem","position":4,"name":"Building construction","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/civil-engineering\/building-construction\/"},{"@type":"ListItem","position":5,"name":"Depth of lean concrete bed placed at the bottom of a wall footing, is kept A. 10 cm B. 15 cm C. Equal to its projection beyond wall base D. Less than its projection beyond wall base"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=6083"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/6083\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=6083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=6083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=6083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}