{"id":5000,"date":"2024-03-05T16:15:58","date_gmt":"2024-03-05T16:15:58","guid":{"rendered":"https:\/\/exam.pscnotes.com\/mcq\/?p=5000"},"modified":"2024-03-05T16:15:58","modified_gmt":"2024-03-05T16:15:58","slug":"indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/mcq\/indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between\/","title":{"rendered":"india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :"},"content":{"rendered":"<p>[amp_mcq option1=&#8221;Mumbai and Ahmedabad (Sabarmati)&#8221; option2=&#8221;Mumbai and Pune&#8221; option3=&#8221;Mumbai and Nagpur&#8221; option4=&#8221;Delhi and Kolkata   &#8221; correct=&#8221;option1&#8243;]<!--more--><\/p>\n<p>The correct answer is (a) Mumbai and Ahmedabad (Sabarmati).<\/p>\n<p>The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.<\/p>\n<p>The bullet train will run at a maximum speed of 320 km\/h and will cover the distance between Mumbai and Ahmedabad in about 2 hours and 50 minutes. The train will have 10 coaches and will be able to carry up to 1,320 passengers.<\/p>\n<p>The bullet train project is expected to cost around \u00e2\u0082\u00b91.1 lakh crore. The project is being funded by the Government of India and the Japan International Cooperation Agency (JICA).<\/p>\n<p>The bullet train project is expected to have a number of benefits, including:<\/p>\n<ul>\n<li>Reduced travel time between Mumbai and Ahmedabad<\/li>\n<li>Increased tourism<\/li>\n<li>Improved connectivity between the two cities<\/li>\n<li>Generation of employment<\/li>\n<li>Boost to the economy<\/li>\n<\/ul>\n<p>The bullet train project has been facing a number of challenges, including:<\/p>\n<ul>\n<li>Land acquisition<\/li>\n<li>Environmental clearances<\/li>\n<li>Financial constraints<\/li>\n<li>Protests from locals<\/li>\n<\/ul>\n<p>Despite the challenges, the bullet train project is progressing on schedule and is expected to be completed in 2023.<\/p>\n<p>The other options are incorrect because they are not the routes that the bullet train will be traveling on.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[amp_mcq option1=&#8221;Mumbai and Ahmedabad (Sabarmati)&#8221; option2=&#8221;Mumbai and Pune&#8221; option3=&#8221;Mumbai and Nagpur&#8221; option4=&#8221;Delhi and Kolkata &#8221; correct=&#8221;option1&#8243;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[83],"tags":[],"class_list":["post-5000","post","type-post","status-publish","format-standard","hentry","category-transportation","no-featured-image-padding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :<\/title>\n<meta name=\"description\" content=\"The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/mcq\/indiaa\u0080\u0099s-first-a\u0080\u0098bullet-train-projecta\u0080\u0099-is-under-construction-in-between\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :\" \/>\n<meta property=\"og:description\" content=\"The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/mcq\/indiaa\u0080\u0099s-first-a\u0080\u0098bullet-train-projecta\u0080\u0099-is-under-construction-in-between\/\" \/>\n<meta property=\"og:site_name\" content=\"MCQ and Quiz for Exams\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-05T16:15:58+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :","description":"The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/mcq\/indiaa\u0080\u0099s-first-a\u0080\u0098bullet-train-projecta\u0080\u0099-is-under-construction-in-between\/","og_locale":"en_US","og_type":"article","og_title":"india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :","og_description":"The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.","og_url":"https:\/\/exam.pscnotes.com\/mcq\/indiaa\u0080\u0099s-first-a\u0080\u0098bullet-train-projecta\u0080\u0099-is-under-construction-in-between\/","og_site_name":"MCQ and Quiz for Exams","article_published_time":"2024-03-05T16:15:58+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/mcq\/indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between\/","url":"https:\/\/exam.pscnotes.com\/mcq\/indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between\/","name":"india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#website"},"datePublished":"2024-03-05T16:15:58+00:00","dateModified":"2024-03-05T16:15:58+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"description":"The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.","breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/mcq\/indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/mcq\/indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/mcq\/indiaa%c2%80%c2%99s-first-a%c2%80%c2%98bullet-train-projecta%c2%80%c2%99-is-under-construction-in-between\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/mcq\/"},{"@type":"ListItem","position":2,"name":"mcq","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/"},{"@type":"ListItem","position":3,"name":"transportation","item":"https:\/\/exam.pscnotes.com\/mcq\/category\/mcq\/transportation\/"},{"@type":"ListItem","position":4,"name":"india\u00e2\u0080\u0099s first \u00e2\u0080\u0098Bullet Train Project\u00e2\u0080\u0099 is under construction in between :"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/mcq\/#website","url":"https:\/\/exam.pscnotes.com\/mcq\/","name":"MCQ and Quiz for Exams","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/mcq\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/mcq\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/mcq\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/5000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/comments?post=5000"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/posts\/5000\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/media?parent=5000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/categories?post=5000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/mcq\/wp-json\/wp\/v2\/tags?post=5000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}