When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by A. T/369(3b) B. T/369(2) C. T/369(1) D. T/409

[amp_mcq option1=”T/369(3b)” option2=”T/369(2)” option3=”T/369(1)” option4=”T/409″ correct=”option1″]

The correct answer is A. T/369(3b).

T/369(3b) is a regulation that requires trains to be piloted into the station during reception when working on T/D912 in automatic block in system. This is to ensure that the train is safely brought to a stop in the station.

T/369(2) is a regulation that requires trains to be piloted into the station during departure when working on T/D912 in automatic block in system. This is to ensure that the train is safely brought to a start in the station.

T/369(1) is a regulation that requires trains to be piloted into the station during normal operation when working on T/D912 in automatic block in system. This is to ensure that the train is safely brought to a stop or start in the station.

T/409 is a regulation that requires trains to be piloted into the station during emergency operation when working on T/D912 in automatic block in system. This is to ensure that the train is safely brought to a stop or start in the station.

In conclusion, the correct answer is A. T/369(3b).