The total production capacity of Beas-Sutlej Link Project is

990 MW
320 MW
1100 MW
850 MW

The correct answer is: 990 MW.

The Beas-Sutlej Link Project is a hydroelectric project in India. It was constructed between 1961 and 1970. The project consists of three dams, two power stations, and a canal system. The total installed capacity of the project is 990 MW.

The three dams are:

  • The Bhakra Dam, which is the largest dam in India.
  • The Pong Dam, which is the second largest dam in India.
  • The Harike Barrage, which is a barrage on the Sutlej River.

The two power stations are:

  • The Bhakra Power Station, which is located at the Bhakra Dam.
  • The Pong Power Station, which is located at the Pong Dam.

The canal system consists of a main canal and a number of branch canals. The main canal is 210 km long and it irrigates an area of 1.2 million hectares. The branch canals irrigate an additional 0.8 million hectares.

The Beas-Sutlej Link Project is a major source of irrigation and hydroelectric power in India. It has played a significant role in the development of the Indian economy.

Option A is incorrect because the total production capacity of the Beas-Sutlej Link Project is 990 MW, not 320 MW.

Option B is incorrect because the total production capacity of the Beas-Sutlej Link Project is 990 MW, not 1100 MW.

Option C is incorrect because the total production capacity of the Beas-Sutlej Link Project is 990 MW, not 850 MW.