The 480 MW Phukot Karnali Hydro Electric Project is situated in
Thailand
Indonesia
Nepal
Bhutan
Answer is Right!
Answer is Wrong!
This question was previously asked in
UPSC NDA-2 – 2023
The correct answer is C. The 480 MW Phukot Karnali Hydro Electric Project is situated in Nepal.
The Phukot Karnali Hydro Electric Project is a proposed run-of-river hydropower project located on the Karnali River in Kalikot District, Karnali Province of Nepal. It is being developed by Nepal Electricity Authority and NHPC Limited (India) through a joint venture.