india’s first ‘Bullet Train Project’ is under construction in between :

Mumbai and Ahmedabad (Sabarmati)
Mumbai and Pune
Mumbai and Nagpur
Delhi and Kolkata

The correct answer is (a) Mumbai and Ahmedabad (Sabarmati).

The bullet train project is a high-speed rail corridor connecting Mumbai and Ahmedabad. It is the first high-speed rail project in India and is being built by the National High-Speed Rail Corporation Limited (NHSRCL). The project is expected to be completed in 2023.

The bullet train will run at a maximum speed of 320 km/h and will cover the distance between Mumbai and Ahmedabad in about 2 hours and 50 minutes. The train will have 10 coaches and will be able to carry up to 1,320 passengers.

The bullet train project is expected to cost around ₹1.1 lakh crore. The project is being funded by the Government of India and the Japan International Cooperation Agency (JICA).

The bullet train project is expected to have a number of benefits, including:

  • Reduced travel time between Mumbai and Ahmedabad
  • Increased tourism
  • Improved connectivity between the two cities
  • Generation of employment
  • Boost to the economy

The bullet train project has been facing a number of challenges, including:

  • Land acquisition
  • Environmental clearances
  • Financial constraints
  • Protests from locals

Despite the challenges, the bullet train project is progressing on schedule and is expected to be completed in 2023.

The other options are incorrect because they are not the routes that the bullet train will be traveling on.

Exit mobile version