The correct answer is A. $1500 per machine hour.
The cost allocation rate is the amount of overhead cost that is allocated to each machine hour. It is calculated by dividing the total overhead cost by the number of machine hours. In this case, the total overhead cost is $500000 and the number of machine hours is 1000. Therefore, the cost allocation
24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube