How much should an organisation spend for information can be determined by some type of a: A. cost analysis B. benefit analysis C. cost-benefit analysis D. any of the above E. None of the above

cost analysis
benefit analysis
cost-benefit analysis
any of the above E. None of the above

The correct answer is: C. cost-benefit analysis.

A cost-benefit analysis is a systematic approach to estimating the costs and benefits of a project, program, or policy. It is used to compare the costs and benefits of different alternatives and to determine which alternative is the most cost-effective.

A cost analysis is a study of the costs associated with a project, program, or policy. It is used to determine the total cost of the project, including the direct and indirect costs.

A benefit analysis is a study of the benefits associated with a project, program, or policy. It is used to determine the value of the benefits that will be achieved by the project.

A cost-benefit analysis is the most comprehensive approach to determining the value of a project, program, or policy. It takes into account both the costs and the benefits of the project.

A cost analysis and a benefit analysis are both useful tools for determining the value of a project, but they do not take into account the costs and benefits of the project.

Therefore, the correct answer is: C. cost-benefit analysis.