Document, which contains information about used material sequence, detail and quantity of raw material is classified as

bill of materials
bill of sequence
bill of detail
bill of raw materials

The correct answer is A. bill of materials.

A bill of materials (BOM) is a list of the raw materials, subassemblies, and components that are required to build a product. It also includes the quantity of each item that is needed. The BOM is used to create a production schedule and to track inventory levels.

A bill of sequence is a list of the steps that are required to build a product. It includes the order in which the steps must be performed and the time required for each step. The bill of sequence is used to create a work order and to track the progress of production.

A bill of detail is a list of the features and specifications of a product. It includes the dimensions, materials, and finishes of the product. The bill of detail is used to create a product specification and to communicate the product requirements to the manufacturing team.

A bill of raw materials is a list of the raw materials that are required to build a product. It includes the quantity of each item that is needed. The bill of raw materials is used to create a purchase order and to track inventory levels.

In conclusion, the correct answer is A. bill of materials.