The correct answer is A. bill of materials.
A bill of materials (BOM) is a list of the raw materials, subassemblies, and components that are required to build a product. It also includes the quantity of each item that is needed. The BOM is used to create a production schedule and to track inventory levels.
A bill of sequence is a list of the steps that are required to build a product. It includes the order in which the steps must be performed and the time required for each step. The bill of sequence is used to create a work order and to track the progress of production.
A bill of detail is a list of the features and specifications of a product. It includes the dimensions, materials, and finishes of the product. The bill of detail is used to create a product specification and to communicate the product requirements to the manufacturing team.
A bill of raw materials is a list of the raw materials that are required to build a product. It includes the quantity of each item that is needed. The bill of raw materials is used to create a purchase order and to track inventory levels.
In conclusion, the correct answer is A. bill of materials.