3. The camber of road should be approximately equal to A. longitudinal gradient B. two times the longitudinal gradient C. three times the longitudinal gradient D. half the longitudinal gradient

[amp_mcq option1=”longitudinal gradient” option2=”two times the longitudinal gradient” option3=”three times the longitudinal gradient” option4=”half the longitudinal gradient” correct=”option4″]

Detailed SolutionThe camber of road should be approximately equal to A. longitudinal gradient B. two times the longitudinal gradient C. three times the longitudinal gradient D. half the longitudinal gradient

4. Group index method of design of flexible pavement is A. A theoretical method B. An empirical method based on physical properties of sub-grade soil C. An empirical method based on strength characteristics of sub-grade soil D. A semi empirical method

[amp_mcq option1=”A theoretical method” option2=”An empirical method based on physical properties of sub-grade soil” option3=”An empirical method based on strength characteristics of sub-grade soil” option4=”A semi empirical method” correct=”option2″]

Detailed SolutionGroup index method of design of flexible pavement is A. A theoretical method B. An empirical method based on physical properties of sub-grade soil C. An empirical method based on strength characteristics of sub-grade soil D. A semi empirical method

7. The diagram which shows all important physical conditions of an accident location like roadway limits, bridges, trees and all details of roadway conditions is known as A. pie chart B. spot maps C. condition diagram D. collision diagram

[amp_mcq option1=”pie chart” option2=”spot maps” option3=”condition diagram” option4=”collision diagram” correct=”option3″]

Detailed SolutionThe diagram which shows all important physical conditions of an accident location like roadway limits, bridges, trees and all details of roadway conditions is known as A. pie chart B. spot maps C. condition diagram D. collision diagram

8. Select the incorrect statement. A. Stop or red time of a signal is the sum of go and clearance intervals for the cross flow. B. Go or green time of a signal is the sum of stop and clearance intervals for the cross flow. C. Clearance time is generally 3 to 5 seconds. D. The cycle length is normally 40 to 60 seconds for two phase signals.

[amp_mcq option1=”Stop or red time of a signal is the sum of go and clearance intervals for the cross flow.” option2=”Go or green time of a signal is the sum of stop and clearance intervals for the cross flow.” option3=”Clearance time is generally 3 to 5 seconds.” option4=”The cycle length is normally 40 to 60 seconds for two phase signals.” correct=”option1″]

Detailed SolutionSelect the incorrect statement. A. Stop or red time of a signal is the sum of go and clearance intervals for the cross flow. B. Go or green time of a signal is the sum of stop and clearance intervals for the cross flow. C. Clearance time is generally 3 to 5 seconds. D. The cycle length is normally 40 to 60 seconds for two phase signals.

10. Flexible pavement distribute the wheel load A. directly to subgrade B. through structural action C. through a set of layers to the subgrade D. none of the above

[amp_mcq option1=”directly to subgrade” option2=”through structural action” option3=”through a set of layers to the subgrade” option4=”none of the above” correct=”option2″]

Detailed SolutionFlexible pavement distribute the wheel load A. directly to subgrade B. through structural action C. through a set of layers to the subgrade D. none of the above