1. The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to A. 2 kg/tonne B. 6 kg/tonne C. 9 kg/tonne D. 20 kg/tonne

2 kg/tonne
6 kg/tonne
9 kg/tonne
20 kg/tonne

Detailed SolutionThe grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to A. 2 kg/tonne B. 6 kg/tonne C. 9 kg/tonne D. 20 kg/tonne

5. Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same A. A is correct but R is not correct B. R is correct but A is not correct C. Both A and R is correct D. Both A and R is incorrect

A is correct but R is not correct
R is correct but A is not correct
Both A and R is correct
Both A and R is incorrect

Detailed SolutionAssertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same A. A is correct but R is not correct B. R is correct but A is not correct C. Both A and R is correct D. Both A and R is incorrect

7. If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is A. 500 cum B. 1000 cum C. 1500 cum D. 2000 cum

500 cum
1000 cum
1500 cum
2000 cum

Detailed SolutionIf the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is A. 500 cum B. 1000 cum C. 1500 cum D. 2000 cum

8. While filling the tender for any work, the contractor considers A. Site survey B. Availability of construction materials C. Availability of labour D. All the above

Site survey
Availability of construction materials
Availability of labour
All the above

Detailed SolutionWhile filling the tender for any work, the contractor considers A. Site survey B. Availability of construction materials C. Availability of labour D. All the above

10. Whenever an activity has zero total float, then A. Free float of the activity must be zero but independent float need not be zero B. Independent float must be zero but free float need not be zero C. Free float and independent float both must be zero D. Free float and independent float both need not be zero

Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero

Detailed SolutionWhenever an activity has zero total float, then A. Free float of the activity must be zero but independent float need not be zero B. Independent float must be zero but free float need not be zero C. Free float and independent float both must be zero D. Free float and independent float both need not be zero