893. Assertion (A) Break-even point can be determined both mathematically as well as graphically. Reason (R) When it is determined on a graph paper, the graph drawn is named as ‘break-even chart’.

(A) is true, but (R) is false
(A) is false, but (R) is true
Both (A) and (R) are true and (R) is the correct explanation of (A)
Both (A) and (R) are true, but (R) is not the correct explanation of (A)

Detailed SolutionAssertion (A) Break-even point can be determined both mathematically as well as graphically. Reason (R) When

it is determined on a graph paper, the graph drawn is named as ‘break-even chart’.

895. When actual loss is . . . . . . . . than the estimated loss, the difference between the two is considered to be abnormal loss.

more
less
Both A and B
None of these

Subscribe on YouTube

class="read-more button" href="https://exam.pscnotes.com/mcq/when-actual-loss-is-than-the-estimated-loss-the-difference-between-the-two-is-considered-to-be-abnormal-loss/#more-46586">Detailed SolutionWhen actual loss is . . . . . . . . than the estimated loss, the difference between the two is considered to be abnormal loss.

896. Expenditure over and above prime cost is known as ________.

overhead
factory cost
cost of sales
cost of production

Join Our Telegram Channel

213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube href="https://exam.pscnotes.com/mcq/expenditure-over-and-above-prime-cost-is-known-as-________/#more-46568">Detailed SolutionExpenditure over and above prime cost is known as ________.

897. Compelling strategic plan, promoting coordination and providing framework of performance are

advantages of budget
disadvantages of budget
advantages of costing method
disadvantages of costing method

Subscribe on YouTube

providing framework of performance are" class="read-more button" href="https://exam.pscnotes.com/mcq/compelling-strategic-plan-promoting-coordination-and-providing-framework-of-performance-are/#more-46565">Detailed SolutionCompelling strategic plan, promoting coordination and providing framework of performance are

898. Partial or completed units of manufactured goods, that do not meet customer specifications and get sold at reduced price or simply discarded, are called

spoilage
rework
scrap
equivalence

Subscribe on YouTube

class="read-more button" href="https://exam.pscnotes.com/mcq/partial-or-completed-units-of-manufactured-goods-that-do-not-meet-customer-specifications-and-get-sold-at-reduced-price-or-simply-discarded-are-called/#more-46555">Detailed SolutionPartial or completed units of manufactured goods, that do not meet customer specifications and get sold at reduced price or simply discarded, are called

899. Added value is the change in . . . . . . . .

market value
cost
income
None of the above

Detailed SolutionAdded value

is the change in . . . . . . . .

900. Statement (A): It is necessary to tally current costs with current income in order to find out the correct profit. Reason (R): LIFO ensures matching of current costs with current income.

Both A and R are correct and R is the correct explanation of A
Both A and R are correct but R is not the correct explanation of A
A is correct but R is incorrect
A is incorrect but R is correct

Detailed SolutionStatement (A): It is necessary to

tally current costs with current income in order to find out the correct profit. Reason (R): LIFO ensures matching of current costs with current income.


Test 1Test 2Test 3Test 4Test 5Test 6Test 7Test 8Test 9Test 10Test 11Test 12Test 13Test 14Test 15Test 16Test 17Test 18Test 19Test 20Test 21Test 22Test 23Test 24
Exit mobile version