Costing
larger residual terms
zero residual terms
variable residual terms
smaller residual terms
Answer is Wrong!
Answer is Right!
162. Tender for construction is an
Estimation of profit
Estimation of cost
Estimation of selling price
Estimation of work
Answer is Wrong!
Answer is Right!
163. Total Material cost variance =
Standard cost of materials - actual cost of materials
Budgeted cost of materials - actual cost of materials
Standard cost of materials - budgeted cost of materials
Actual cost of materials - budgeted cost of materials
Answer is Wrong!
Answer is Right!
164. Cost accounting concepts include all the following except ________.
planning
controlling
profit sharing
product costing
Answer is Wrong!
Answer is Right!
Detailed SolutionCost accounting concepts include all the following except ________.
165. The requirements of a particular job are known as . . . . . . . .
job description
job specifications
job evaluation
Both A and B
Answer is Wrong!
Answer is Right!
Detailed SolutionThe requirements of a particular job are known as . . . . . . . .
166. Description in mathematical form to represent changes in cost, with level of activity related to that cost is classified as
cost function
revenue function
unit function
relative function
Answer is Wrong!
Answer is Right!
167. Fixed Cost ± Profit or Loss = . . . . . . . .
Variable Cost
Marginal Cost
Contribution
Margin of Safety E. Break Even Point
Answer is Wrong!
Answer is Right!
Detailed SolutionFixed Cost ± Profit or Loss = . . . . . . . .
168. Cost Unit is defined as:
Unit of quantity of product, service or time in relation to which costs may be ascertained or expressed
A location, person or an item of equipment or a group of these for which costs are ascertained and used for cost control
Centres having the responsibility of generating and maximising profits
Centres concerned with earning an adequate return on investment
Answer is Wrong!
Answer is Right!
169. Which one of the following concepts is used as fund in the preparation of funds flow statement?
Current Assets
Working Capital
Cash
All Financial Resources
Answer is Wrong!
Answer is Right!
170. . . . . . . . . budget is designed to remain unchanged irrespective of the volume of output or turnover attained.
Master
Fixed
Flexible
All of these
Answer is Wrong!
Answer is Right!