As of 2022, which one of the following is the estimated installed capa

As of 2022, which one of the following is the estimated installed capacity of nuclear power in India ?

About 45000 MW
About 23000 MW
About 7000 MW
About 2000 MW
This question was previously asked in
UPSC CISF-AC-EXE – 2023
The correct answer is C.
As of 2022, the estimated installed capacity of nuclear power in India was around 6.78 GW (6780 MW). Several new reactors were under construction or planned to significantly increase this capacity in the future. Among the given options, about 7000 MW is the closest figure to the installed capacity in 2022.
India has a phased program for developing nuclear power. The country operates a mix of Pressurized Heavy Water Reactors (PHWRs) and has collaborations for Light Water Reactors (LWRs). The target is to increase nuclear power capacity substantially to meet future energy demands and reduce carbon emissions.