A bill of material is prepared in case of a . . . . . . . . job.

standard job
non-standardized job
Both A and B
None of these

The correct answer is: A bill of material is prepared in case of a standard job.

A bill of materials (BOM) is a list of the components that make up a product, along with the quantity of each component required. It is used to plan and control production, and to ensure that the correct components are available when needed.

A standard job is a job that is performed repeatedly, with the same steps and procedures each time. This type of job is well-suited for use with a BOM, as the components required can be easily identified and tracked.

A non-standardized job is a job that is performed less frequently, or with different steps and procedures each time. This type of job is not well-suited for use with a BOM, as the components required may vary from one job to the next.

In conclusion, a bill of material is prepared in case of a standard job, as

64 74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube
this type of job is well-suited for use with a BOM.
Exit mobile version