After the bifurcation, 9 projects with an outlay of . . . . . . . . were transferred to the Union territory of Ladakh.

Rs. 10,441 crore
Rs. 15,000 crore
Rs. 20,150 crore
Rs. 21,441 crore

The correct answer is: A. Rs. 10,441 crore

After the bifurcation of Jammu and Kashmir into two Union Territories, 9 projects with an outlay of Rs. 10,441 crore were transferred to the Union Territory of Ladakh. These projects are:

  1. The Leh-Kargil-Srinagar Highway (434 km)
  2. The Srinagar-Jammu National Highway (840 km)
  3. The Zojila Tunnel (8.4 km)
  4. The Srinagar-Leh Railway Line (435 km)
  5. The Ladakh Ring Road (1,050 km)
  6. The Kargil-Drass Road (210 km)
  7. The Leh-Manali Road (470 km)
  8. The Leh-Nubra Road (240 km)
  9. The Leh-Alchi Road (130 km)

These projects are vital for the development of Ladakh and will help to improve connectivity, infrastructure, and economic growth in the region.

Option B is incorrect because it is the total outlay of all the projects that were transferred to the Union Territory of Ladakh. Option C is incorrect because it is the outlay of the Zojila Tunnel project. Option D is incorrect because it is the outlay of the Srinagar-Leh Railway Line project.