The correct answer is: C. 1963
The Kosi Multipurpose Project is a river training and flood control project on the Kosi River in Nepal and India. It was completed in 1963. The project includes a barrage, a canal system, and a number of other structures. The main purpose of the project is to control floods and to provide irrigation water for agriculture. The project has also been used to generate hydroelectric power.
The Kosi River is a major river in Nepal and India. It originates in the Himalayas and flows through Nepal and India before joining the Ganges River. The Kosi River is a major source of water for irrigation and drinking water in Nepal and India. However, the river is also prone to flooding. The Kosi Multipurpose Project was designed to control floods and to provide irrigation water for agriculture.
The Kosi Multipurpose Project has been controversial since its inception. Some people have argued that the project has not been effective in controlling floods. Others have argued that the project has had a negative impact on the environment. However, the project remains an important part of the infrastructure of Nepal and India.
Here is a brief explanation of each option:
- Option A: 1950. This is incorrect because the Kosi Multipurpose Project was not completed until 1963.
- Option B: 1953. This is incorrect because the Kosi Multipurpose Project was not completed until 1963.
- Option C: 1963. This is the correct answer because the Kosi Multipurpose Project was completed in 1963.
- Option D: 1977. This is incorrect because the Kosi Multipurpose Project was completed in 1963.