prime
works
production
Both A and B
Answer is Right!
Answer is Wrong!
The correct answer is: Both A and B.
Prime cost is the total of direct material cost and direct labor cost. It is the cost of the materials and labor that are directly involved in the production of a product.
Works cost is the total of prime cost and indirect
42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube