The correct answer is: A. T/806+LSSS.
A T/806 is a form used to report a block forwarding. A block forwarding is when a shipment is sent to a different address than the one on the shipping label. The T/806 must be completed by the carrier and the shipper. The LSSS is a list of the items that are being forwarded. The LSSS must be completed by the shipper.
A T/608 is a form used to report a loss or damage claim. A loss or damage claim is when a shipment is lost or damaged during transportation. The T/608 must be completed by the shipper.
Both the T/806 and the T/608 are important forms that must be completed when there is a problem with a shipment. The T/806 is used to report a block forwarding, and the T/608 is used to report a loss or damage claim.
Here is a brief explanation of each option:
- Option A: T/806+LSSS. The T/806 is a form used to report a block forwarding. A block forwarding is when a shipment is sent to a different address than the one on the shipping label. The T/806 must be completed by the carrier and the shipper. The LSSS is a list of the items that are being forwarded. The LSSS must be completed by the shipper.
- Option B: T/608. The T/608 is a form used to report a loss or damage claim. A loss or damage claim is when a shipment is lost or damaged during transportation. The T/608 must be completed by the shipper.
- Option C: Both. Both the T/806 and the T/608 are important forms that must be completed when there is a problem with a shipment. The T/806 is used to report a block forwarding, and the T/608 is used to report a loss or damage claim.
- Option D: None of these. None of the options are correct. The correct answer is A.