{"id":7913,"date":"2024-06-14T03:22:23","date_gmt":"2024-06-14T03:22:23","guid":{"rendered":"https:\/\/exam.pscnotes.com\/current-affairs\/?p=7913"},"modified":"2024-06-14T03:22:23","modified_gmt":"2024-06-14T03:22:23","slug":"mp-transco-energized-states-first-bus-reactor-of-220-kv","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/current-affairs\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/","title":{"rendered":"MP Transco energized state&#8217;s first bus reactor of 220 kv"},"content":{"rendered":"<p>MP Transco has succeeded in installing &amp; energizing state&#8217;s first 50 MVAR capacity bus reactor at its 220 KV substation Pandhurna (Chhindwara). Madhya Pradesh&#8217;s Energy Minister Mr. Pradyuman Singh Tomar congratulated all the related personnel of MP Transco for this achievement and said that inter-state power transmission will be facilitated after the energization of this reactor established at a cost of about Rs 08 crore 67 lakh.<\/p>\n<p>He told that for the first time in Madhya Pradesh, a reactor of 50 M VAR capacity has been energized on a 220 KV bus. With this, where grid discipline can be easily followed, inter-state power exchange from Maharashtra can be controlled through 220 KV V line between Padhunna and Kalameshwar substation of Maharashtra.<\/p>\n<p>To save the Madhya Pradesh Power Transmission Company from paying possible penalty due to reactive power feed and to solve the problem of high voltage in the area, Sanjeev Srivastava, Superintending Engineer of MP Power Transmission Company, designed and developed this reactor, which was used for the first time in the state. Important efforts were made in preparing the tender process including technical parameters, due to which this innovation became possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MP Transco has succeeded in installing &amp; energizing state&#8217;s first 50 MVAR capacity bus reactor at its 220 KV substation Pandhurna (Chhindwara). Madhya Pradesh&#8217;s Energy Minister Mr. Pradyuman Singh Tomar congratulated all the related personnel of MP Transco for this achievement and said that inter-state power transmission will be facilitated after the energization of this &#8230; <a title=\"MP Transco energized state&#8217;s first bus reactor of 220 kv\" class=\"read-more\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/\" aria-label=\"Read more about MP Transco energized state&#8217;s first bus reactor of 220 kv\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[749],"class_list":["post-7913","post","type-post","status-publish","format-standard","hentry","category-madhya-pradesh","tag-10-05-23"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>MP Transco energized state&#039;s first bus reactor of 220 kv - Current Affairs Exam<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MP Transco energized state&#039;s first bus reactor of 220 kv\" \/>\n<meta property=\"og:description\" content=\"MP Transco has succeeded in installing &amp; energizing state&#8217;s first 50 MVAR capacity bus reactor at its 220 KV substation Pandhurna (Chhindwara). Madhya Pradesh&#8217;s Energy Minister Mr. Pradyuman Singh Tomar congratulated all the related personnel of MP Transco for this achievement and said that inter-state power transmission will be facilitated after the energization of this ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/\" \/>\n<meta property=\"og:site_name\" content=\"Current Affairs Exam\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-14T03:22:23+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MP Transco energized state's first bus reactor of 220 kv - Current Affairs Exam","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/","og_locale":"en_US","og_type":"article","og_title":"MP Transco energized state's first bus reactor of 220 kv","og_description":"MP Transco has succeeded in installing &amp; energizing state&#8217;s first 50 MVAR capacity bus reactor at its 220 KV substation Pandhurna (Chhindwara). Madhya Pradesh&#8217;s Energy Minister Mr. Pradyuman Singh Tomar congratulated all the related personnel of MP Transco for this achievement and said that inter-state power transmission will be facilitated after the energization of this ... Read more","og_url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/","og_site_name":"Current Affairs Exam","article_published_time":"2024-06-14T03:22:23+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/","url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/","name":"MP Transco energized state's first bus reactor of 220 kv - Current Affairs Exam","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website"},"datePublished":"2024-06-14T03:22:23+00:00","dateModified":"2024-06-14T03:22:23+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/mp-transco-energized-states-first-bus-reactor-of-220-kv\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/current-affairs\/"},{"@type":"ListItem","position":2,"name":"MP Transco energized state&#8217;s first bus reactor of 220 kv"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website","url":"https:\/\/exam.pscnotes.com\/current-affairs\/","name":"Current Affairs Exam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/current-affairs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/current-affairs\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/7913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=7913"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/7913\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=7913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=7913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=7913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}