{"id":7746,"date":"2024-06-14T03:17:24","date_gmt":"2024-06-14T03:17:24","guid":{"rendered":"https:\/\/exam.pscnotes.com\/current-affairs\/?p=7746"},"modified":"2024-06-14T03:17:24","modified_gmt":"2024-06-14T03:17:24","slug":"300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/current-affairs\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/","title":{"rendered":"300 MW canal top and floating solar power projects to be set up in Punjab"},"content":{"rendered":"<p>To ramp up  while utilizing natural sources optimally, Punjab Government has decided to install Solar Power Photovoltaic (PV) projects with a total capacity of 300 megawatt (MW) in the State, including 200 MW canal top solar PV power projects and 100 MW floating solar PV power project on the reservoirs and lakes.<\/p>\n<p>The state New and Renewable Energy Sources Minister Aman Arora, taking the decision in a high-level meeting, said that the proposed 200 MW Canal Top Solar Project would be installed in a phased manner, under which 50 MW would be installed in the first phase, while projects of remaining capacity would be installed in subsequent phases.<\/p>\n<p>These projects will be executed in Build, Operate and Own (BOO) mode by Punjab Energy Development Agency (PEDA), he added.<\/p>\n<p>Similarly, Floating Solar PV Projects are also a new emerging idea being implemented in the country for using the potential area on lakes and reservoirs, which will also lead to saving thousands acres of precious agricultural land. The cost of Floating Solar PV Projects would be around Rs 4.80 crore per MW after considering 20 per cent VGF.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>To ramp up while utilizing natural sources optimally, Punjab Government has decided to install Solar Power Photovoltaic (PV) projects with a total capacity of 300 megawatt (MW) in the State, including 200 MW canal top solar PV power projects and 100 MW floating solar PV power project on the reservoirs and lakes. The state New &#8230; <a title=\"300 MW canal top and floating solar power projects to be set up in Punjab\" class=\"read-more\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/\" aria-label=\"Read more about 300 MW canal top and floating solar power projects to be set up in Punjab\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1092],"tags":[743],"class_list":["post-7746","post","type-post","status-publish","format-standard","hentry","category-punjab","tag-09-11-22"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>300 MW canal top and floating solar power projects to be set up in Punjab - Current Affairs Exam<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"300 MW canal top and floating solar power projects to be set up in Punjab\" \/>\n<meta property=\"og:description\" content=\"To ramp up while utilizing natural sources optimally, Punjab Government has decided to install Solar Power Photovoltaic (PV) projects with a total capacity of 300 megawatt (MW) in the State, including 200 MW canal top solar PV power projects and 100 MW floating solar PV power project on the reservoirs and lakes. The state New ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/\" \/>\n<meta property=\"og:site_name\" content=\"Current Affairs Exam\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-14T03:17:24+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"300 MW canal top and floating solar power projects to be set up in Punjab - Current Affairs Exam","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/","og_locale":"en_US","og_type":"article","og_title":"300 MW canal top and floating solar power projects to be set up in Punjab","og_description":"To ramp up while utilizing natural sources optimally, Punjab Government has decided to install Solar Power Photovoltaic (PV) projects with a total capacity of 300 megawatt (MW) in the State, including 200 MW canal top solar PV power projects and 100 MW floating solar PV power project on the reservoirs and lakes. The state New ... Read more","og_url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/","og_site_name":"Current Affairs Exam","article_published_time":"2024-06-14T03:17:24+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/","url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/","name":"300 MW canal top and floating solar power projects to be set up in Punjab - Current Affairs Exam","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website"},"datePublished":"2024-06-14T03:17:24+00:00","dateModified":"2024-06-14T03:17:24+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/300-mw-canal-top-and-floating-solar-power-projects-to-be-set-up-in-punjab\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/current-affairs\/"},{"@type":"ListItem","position":2,"name":"300 MW canal top and floating solar power projects to be set up in Punjab"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website","url":"https:\/\/exam.pscnotes.com\/current-affairs\/","name":"Current Affairs Exam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/current-affairs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/current-affairs\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/7746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=7746"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/7746\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=7746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=7746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=7746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}