{"id":6929,"date":"2024-06-14T02:51:53","date_gmt":"2024-06-14T02:51:53","guid":{"rendered":"https:\/\/exam.pscnotes.com\/current-affairs\/?p=6929"},"modified":"2024-06-14T02:51:53","modified_gmt":"2024-06-14T02:51:53","slug":"pressure-on-rerc-to-raise-net-metering-load-up-to-500kw","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/current-affairs\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/","title":{"rendered":"Pressure on RERC to raise net metering load up to 500KW"},"content":{"rendered":"<p>ith Haryana and Punjab governments allowing net metering benefits for solar rooftop <a href=\"https:\/\/exam.pscnotes.com\/plants\">Plants<\/a> with loads up to 500KW, pressure is on Rajasthan Electricity Regulatory Commission (RERC) to follow suit before the current regime ends in September.<\/p>\n<p>Following a regulatory decision by Union ministry of power last year, RERC had also restricted the net metering load for solar rooftop projects to 10KW from 1MW earlier, but had postponed its implementation till September 15 after the  protested.<\/p>\n<p>After the Union power ministry allowed net metering for 500 KW, energy regulators in Haryana and Punjab have notified allowing the same capacity for net metering but RERC is yet to take a call even as the September 15 deadline is a week away. A representative of the Rajasthan Solar Association said they had written letters to energy minister, regulator principal secretary and Rajasthan <a href=\"https:\/\/exam.pscnotes.com\/renewable-energy\">RENEWABLE ENERGY<\/a> Corporation to revisit the 10KW criteria and increase the load up to 500KW as has been proposed in the draft regulations by the Union ministry of power.<\/p>\n<p>Under net metering, the consumer uses cheaper rooftop solar power instead of the costly discom power. As per new rules, projects above 10KW will come under gross billing or metering which requires them to pay normal electricity rate to discoms even though they uses cheap power from its rooftop plant. The discoms will pay the rooftop projects owners under gross metering at rates discovered through auction along with 25% incentive which is estimated to be far lower than the discom rates of around Rs 8 per unit.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ith Haryana and Punjab governments allowing net metering benefits for solar rooftop Plants with loads up to 500KW, pressure is on Rajasthan Electricity Regulatory Commission (RERC) to follow suit before the current regime ends in September. Following a regulatory decision by Union ministry of power last year, RERC had also restricted the net metering load &#8230; <a title=\"Pressure on RERC to raise net metering load up to 500KW\" class=\"read-more\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/\" aria-label=\"Read more about Pressure on RERC to raise net metering load up to 500KW\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1083],"tags":[705],"class_list":["post-6929","post","type-post","status-publish","format-standard","hentry","category-rajasthan","tag-07-09-21"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Pressure on RERC to raise net metering load up to 500KW - Current Affairs Exam<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pressure on RERC to raise net metering load up to 500KW\" \/>\n<meta property=\"og:description\" content=\"ith Haryana and Punjab governments allowing net metering benefits for solar rooftop Plants with loads up to 500KW, pressure is on Rajasthan Electricity Regulatory Commission (RERC) to follow suit before the current regime ends in September. Following a regulatory decision by Union ministry of power last year, RERC had also restricted the net metering load ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/\" \/>\n<meta property=\"og:site_name\" content=\"Current Affairs Exam\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-14T02:51:53+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pressure on RERC to raise net metering load up to 500KW - Current Affairs Exam","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/","og_locale":"en_US","og_type":"article","og_title":"Pressure on RERC to raise net metering load up to 500KW","og_description":"ith Haryana and Punjab governments allowing net metering benefits for solar rooftop Plants with loads up to 500KW, pressure is on Rajasthan Electricity Regulatory Commission (RERC) to follow suit before the current regime ends in September. Following a regulatory decision by Union ministry of power last year, RERC had also restricted the net metering load ... Read more","og_url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/","og_site_name":"Current Affairs Exam","article_published_time":"2024-06-14T02:51:53+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/","url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/","name":"Pressure on RERC to raise net metering load up to 500KW - Current Affairs Exam","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website"},"datePublished":"2024-06-14T02:51:53+00:00","dateModified":"2024-06-14T02:51:53+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/pressure-on-rerc-to-raise-net-metering-load-up-to-500kw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/current-affairs\/"},{"@type":"ListItem","position":2,"name":"Pressure on RERC to raise net metering load up to 500KW"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website","url":"https:\/\/exam.pscnotes.com\/current-affairs\/","name":"Current Affairs Exam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/current-affairs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/current-affairs\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/6929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=6929"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/6929\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=6929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=6929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=6929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}