{"id":4392,"date":"2024-06-14T00:27:50","date_gmt":"2024-06-14T00:27:50","guid":{"rendered":"https:\/\/exam.pscnotes.com\/current-affairs\/?p=4392"},"modified":"2024-06-14T00:27:50","modified_gmt":"2024-06-14T00:27:50","slug":"nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/current-affairs\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/","title":{"rendered":"Nepal has decided to allow IndiasSatluj Jal Vidyut\nNigam(SJVN) Limited to develop a second hydropower project in\nthe country. At present SJVN is developing a 900-MW Arun -III\nhydroelectric project, a run-of-river located on the Arun River in\nEastern Nepal, scheduled to be completed in 2024. A meeting of\ntheInvestment Board Nepal(IBN) chaired by Prime\nMinister Pushpa Kamal Dahal aka Prachanda approved the draft project\ndevelopment agreement (PDA) to be signed with Indias state-owned SJVN\nto develop the 669-megawatt (MW) Lower Arun Hydropower project in\neastern Nepal."},"content":{"rendered":"<p>The decision for development comes days before Prime Minister Prachanda visited India.<\/p>\n<p>The draft needs to be endorsed by the Council of Ministers before it gets implemented. The previous meeting of the IBN had approved a Rs 92.68 billion  for the development of the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The decision for development comes days before Prime Minister Prachanda visited India. The draft needs to be endorsed by the Council of Ministers before it gets implemented. The previous meeting of the IBN had approved a Rs 92.68 billion for the development of the project.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[595],"tags":[1078],"class_list":["post-4392","post","type-post","status-publish","format-standard","hentry","category-current-affairs","tag-31-05-23"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Nepal has decided to allow IndiasSatluj Jal Vidyut Nigam(SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024. A meeting of theInvestment Board Nepal(IBN) chaired by Prime Minister Pushpa Kamal Dahal aka Prachanda approved the draft project development agreement (PDA) to be signed with Indias state-owned SJVN to develop the 669-megawatt (MW) Lower Arun Hydropower project in eastern Nepal. - Current Affairs Exam<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nepal has decided to allow IndiasSatluj Jal Vidyut Nigam(SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024. A meeting of theInvestment Board Nepal(IBN) chaired by Prime Minister Pushpa Kamal Dahal aka Prachanda approved the draft project development agreement (PDA) to be signed with Indias state-owned SJVN to develop the 669-megawatt (MW) Lower Arun Hydropower project in eastern Nepal.\" \/>\n<meta property=\"og:description\" content=\"The decision for development comes days before Prime Minister Prachanda visited India. The draft needs to be endorsed by the Council of Ministers before it gets implemented. The previous meeting of the IBN had approved a Rs 92.68 billion for the development of the project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/\" \/>\n<meta property=\"og:site_name\" content=\"Current Affairs Exam\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-14T00:27:50+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nepal has decided to allow IndiasSatluj Jal Vidyut Nigam(SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024. A meeting of theInvestment Board Nepal(IBN) chaired by Prime Minister Pushpa Kamal Dahal aka Prachanda approved the draft project development agreement (PDA) to be signed with Indias state-owned SJVN to develop the 669-megawatt (MW) Lower Arun Hydropower project in eastern Nepal. - Current Affairs Exam","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/","og_locale":"en_US","og_type":"article","og_title":"Nepal has decided to allow IndiasSatluj Jal Vidyut Nigam(SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024. A meeting of theInvestment Board Nepal(IBN) chaired by Prime Minister Pushpa Kamal Dahal aka Prachanda approved the draft project development agreement (PDA) to be signed with Indias state-owned SJVN to develop the 669-megawatt (MW) Lower Arun Hydropower project in eastern Nepal.","og_description":"The decision for development comes days before Prime Minister Prachanda visited India. The draft needs to be endorsed by the Council of Ministers before it gets implemented. The previous meeting of the IBN had approved a Rs 92.68 billion for the development of the project.","og_url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/","og_site_name":"Current Affairs Exam","article_published_time":"2024-06-14T00:27:50+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/","url":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/","name":"Nepal has decided to allow IndiasSatluj Jal Vidyut Nigam(SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024. A meeting of theInvestment Board Nepal(IBN) chaired by Prime Minister Pushpa Kamal Dahal aka Prachanda approved the draft project development agreement (PDA) to be signed with Indias state-owned SJVN to develop the 669-megawatt (MW) Lower Arun Hydropower project in eastern Nepal. - Current Affairs Exam","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website"},"datePublished":"2024-06-14T00:27:50+00:00","dateModified":"2024-06-14T00:27:50+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/2024\/06\/14\/nepal-has-decided-to-allow-indiassatluj-jal-vidyutnigamsjvn-limited-to-develop-a-second-hydropower-project-inthe-country-at-present-sjvn-is-developing-a-900-mw-arun-iiihydroelectric-project-a\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/current-affairs\/"},{"@type":"ListItem","position":2,"name":"Nepal has decided to allow IndiasSatluj Jal Vidyut Nigam(SJVN) Limited to develop a second hydropower project in the country. At present SJVN is developing a 900-MW Arun -III hydroelectric project, a run-of-river located on the Arun River in Eastern Nepal, scheduled to be completed in 2024. A meeting of theInvestment Board Nepal(IBN) chaired by Prime Minister Pushpa Kamal Dahal aka Prachanda approved the draft project development agreement (PDA) to be signed with Indias state-owned SJVN to develop the 669-megawatt (MW) Lower Arun Hydropower project in eastern Nepal."}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website","url":"https:\/\/exam.pscnotes.com\/current-affairs\/","name":"Current Affairs Exam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/current-affairs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/current-affairs\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/4392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=4392"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/4392\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=4392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=4392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=4392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}