{"id":14348,"date":"2024-06-14T15:58:41","date_gmt":"2024-06-14T15:58:41","guid":{"rendered":"https:\/\/exam.pscnotes.com\/current-affairs\/?p=14348"},"modified":"2024-06-14T15:58:41","modified_gmt":"2024-06-14T15:58:41","slug":"the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/","title":{"rendered":"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far."},"content":{"rendered":"<p>In 2016, the Railways had faced widespread criticism and protest from people of the state for shifting the proposed wagon maintenance workshop in Kalahandi district to Visakhapatnam of Andhra Pradesh. It had invited sharp political reactions from all the parties. Even chief minister Naveen Patnaik had taken up the issue with the then <a href=\"https:\/\/exam.pscnotes.com\/railway\">RAILWAY<\/a> <div class=\"youtube-subscribe-container\">\r\n        <a href=\"https:\/\/www.youtube.com\/channel\/UCNHT8lW-JmLC68rjBfZhdkg?sub_confirmation=1\" target=\"_blank\" class=\"youtube-subscribe-button\">\r\n            <span class=\"youtube-icon\">\r\n                <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 576 512\">\r\n                    <path d=\"M549.7 124.1c-6.3-23.7-24.8-42.3-48.3-48.6C458.8 64 288 64 288 64S117.2 64 74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z\"\/>\r\n                <\/svg>\r\n            <\/span>\r\n            Subscribe on YouTube\r\n        <\/a>\r\n    <\/div> minister to give an alternate project in Kalahandi district.<\/p>\n<p>Later the Centre had sanctioned the electric loco POH workshop in the Union Budget 2017. This is a maintenance workshop for electric engines. It had sanctioned a token amount in 2017 for the beginning of the project. Four years have already passed, but construction work of the project could not start.<\/p>\n<p>An amount of Rs <div class=\"telegram-channel-container\">\r\n        <a href=\"https:\/\/t.me\/pscnotes2025\" target=\"_blank\" class=\"telegram-channel-button\">\r\n            <span class=\"telegram-icon\">\r\n                <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 496 512\">\r\n                    <path fill=\"white\" d=\"M248,8C111,8,0,119,0,256s111,248,248,248s248-111,248-248S385,8,248,8z M362,177L320,367c-3,14-10,18-20,14l-56-41l-27,26 c-3,3-5,5-10,5l4-63L323,196c5-5-1-7-8-3l-98,62l-42-13c-9-3-10-9,2-14l162-63C351,160,365,164,362,177z\"\/>\r\n                <\/svg>\r\n            <\/span>\r\n            Join Our Telegram Channel\r\n        <\/a>\r\n    <\/div> 3.28 crore has been allocated for the project up to the Budget 2021-22, said the reply of the Union minister.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2016, the Railways had faced widespread criticism and protest from people of the state for shifting the proposed wagon maintenance workshop in Kalahandi district to Visakhapatnam Subscribe on YouTube Join Our Telegram Channel of Andhra Pradesh. It had invited sharp political reactions from all the parties. Even chief minister Naveen Patnaik had taken up &#8230; <a title=\"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far.\" class=\"read-more\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/\">Read more <span class=\"screen-reader-text\">The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far.<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1101],"tags":[1054],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far. - Current Affairs Exam<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far.\" \/>\n<meta property=\"og:description\" content=\"In 2016, the Railways had faced widespread criticism and protest from people of the state for shifting the proposed wagon maintenance workshop in Kalahandi district to Visakhapatnam of Andhra Pradesh. It Join Our Telegram Channel had invited sharp political reactions from all Subscribe on YouTube the parties. Even chief minister Naveen Patnaik had taken up ... Read more The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Current Affairs Exam\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-14T15:58:41+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far. - Current Affairs Exam","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/","og_locale":"en_US","og_type":"article","og_title":"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far.","og_description":"In 2016, the Railways had faced widespread criticism and protest from people of the state for shifting the proposed wagon maintenance workshop in Kalahandi district to Visakhapatnam of Andhra Pradesh. It Join Our Telegram Channel had invited sharp political reactions from all Subscribe on YouTube the parties. Even chief minister Naveen Patnaik had taken up ... Read more The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far.","og_url":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/","og_site_name":"Current Affairs Exam","article_published_time":"2024-06-14T15:58:41+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/","url":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/","name":"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far. - Current Affairs Exam","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website"},"datePublished":"2024-06-14T15:58:41+00:00","dateModified":"2024-06-14T15:58:41+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/the-indian-railways-had-sanctioned-an-electric-loco-periodical-overhauling-poh-workshop-at-narla-inkalahandidistrict-in-the-budget-2017-18-with-an-estimated-cost-of-rs-186-37-crore-but-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/current-affairs\/"},{"@type":"ListItem","position":2,"name":"The Indian Railways had sanctioned an electric loco periodical overhauling (POH) workshop at Narla inKalahandidistrict in the budget 2017-18 with an estimated cost of Rs 186.37 crore.But construction work of this project is yet to start. The Railways has received only 141.07 acres out of 328.35 acres of land required so far."}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website","url":"https:\/\/exam.pscnotes.com\/current-affairs\/","name":"Current Affairs Exam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/current-affairs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d97f17072bfa490596c8f78363955d55?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d97f17072bfa490596c8f78363955d55?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/current-affairs\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/14348"}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=14348"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/14348\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=14348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=14348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=14348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}