{"id":13698,"date":"2024-06-14T15:46:15","date_gmt":"2024-06-14T15:46:15","guid":{"rendered":"https:\/\/exam.pscnotes.com\/current-affairs\/?p=13698"},"modified":"2024-06-14T15:46:15","modified_gmt":"2024-06-14T15:46:15","slug":"four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22","status":"publish","type":"post","link":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/","title":{"rendered":"Four sewage treatment plants in Patna to be made functional by March 22"},"content":{"rendered":"<p>The foursewage treatment <a href=\"https:\/\/exam.pscnotes.com\/plants\">Plants<\/a>(STPs) at Beur, Karmalichak, Saidpur, and Pahadi inPatnawill be made functional by the end of the 2021-2022 financial year. Sewer networks are being laid to connect all the households to the STPs so that untreated water does not get discharged into the Ganga directly.<\/p>\n<p>The foundation for the plants, which have a capacity to treat 200 million litres of wastewater per day, was laid by Prime Minister Narendra Modi at Mokama in Patna district in October 2017.<\/p>\n<p>According to sources, the wastewater will be treated through sequencing batch reactor system and used for <a href=\"https:\/\/exam.pscnotes.com\/irrigation\">Irrigation<\/a> after chlorination.<\/p>\n<p>Two other STPs at Digha and Kankerbagh are in the initial stage of construction. While the one at Digha will have a 228km-long sewer <a href=\"https:\/\/exam.pscnotes.com\/network\">Network<\/a>, the Kankerbagh STP will have a 150km-long sewer network.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The foursewage treatment Plants(STPs) at Beur, Karmalichak, Saidpur, and Pahadi inPatnawill be made functional by the end of the 2021-2022 financial year. Sewer networks are being laid to connect all the households to the STPs so that untreated water does not get discharged into the Ganga directly. The foundation for the plants, which have a &#8230; <a title=\"Four sewage treatment plants in Patna to be made functional by March 22\" class=\"read-more\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/\" aria-label=\"Read more about Four sewage treatment plants in Patna to be made functional by March 22\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1087],"tags":[1025],"class_list":["post-13698","post","type-post","status-publish","format-standard","hentry","category-bihar","tag-27-10-21"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v23.3) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Four sewage treatment plants in Patna to be made functional by March 22 - Current Affairs Exam<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Four sewage treatment plants in Patna to be made functional by March 22\" \/>\n<meta property=\"og:description\" content=\"The foursewage treatment Plants(STPs) at Beur, Karmalichak, Saidpur, and Pahadi inPatnawill be made functional by the end of the 2021-2022 financial year. Sewer networks are being laid to connect all the households to the STPs so that untreated water does not get discharged into the Ganga directly. The foundation for the plants, which have a ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/\" \/>\n<meta property=\"og:site_name\" content=\"Current Affairs Exam\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-14T15:46:15+00:00\" \/>\n<meta name=\"author\" content=\"rawan239\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rawan239\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Four sewage treatment plants in Patna to be made functional by March 22 - Current Affairs Exam","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/","og_locale":"en_US","og_type":"article","og_title":"Four sewage treatment plants in Patna to be made functional by March 22","og_description":"The foursewage treatment Plants(STPs) at Beur, Karmalichak, Saidpur, and Pahadi inPatnawill be made functional by the end of the 2021-2022 financial year. Sewer networks are being laid to connect all the households to the STPs so that untreated water does not get discharged into the Ganga directly. The foundation for the plants, which have a ... Read more","og_url":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/","og_site_name":"Current Affairs Exam","article_published_time":"2024-06-14T15:46:15+00:00","author":"rawan239","twitter_card":"summary_large_image","twitter_misc":{"Written by":"rawan239","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/","url":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/","name":"Four sewage treatment plants in Patna to be made functional by March 22 - Current Affairs Exam","isPartOf":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website"},"datePublished":"2024-06-14T15:46:15+00:00","dateModified":"2024-06-14T15:46:15+00:00","author":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209"},"breadcrumb":{"@id":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/four-sewage-treatment-plants-in-patna-to-be-made-functional-by-march-22\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exam.pscnotes.com\/current-affairs\/"},{"@type":"ListItem","position":2,"name":"Four sewage treatment plants in Patna to be made functional by March 22"}]},{"@type":"WebSite","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#website","url":"https:\/\/exam.pscnotes.com\/current-affairs\/","name":"Current Affairs Exam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exam.pscnotes.com\/current-affairs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/5807dafeb27d2ec82344d6cbd6c3d209","name":"rawan239","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exam.pscnotes.com\/current-affairs\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/761a7274f9cce048fa5b921221e7934820d74514df93ef195a9d22af0c1c9001?s=96&d=mm&r=g","caption":"rawan239"},"sameAs":["https:\/\/exam.pscnotes.com"],"url":"https:\/\/exam.pscnotes.com\/current-affairs\/author\/rawan239\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/13698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=13698"}],"version-history":[{"count":0,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/posts\/13698\/revisions"}],"wp:attachment":[{"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=13698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=13698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exam.pscnotes.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=13698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}