Current Affairs Exam

Tamil Nadu inks Rs 1,815 crore BharatNet deal, to cover 12,525 villages

After two false starts, when the multi-crore BharatNet project had to be scrapped after Corruption allegations, Nadu finally inked a pact marking the take-off of the project touted as info-highway of the future.

On Wednesday, Tamil Nadu FibreNet Corporation Limited (TANFINET) signed the master service agreement for the implementation of the BharatNet Project in Tamil Nadu with System Integrators — M/s L&T

24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube
(Package C), M/s ITI Ltd (Package D) and Third-Party Agency M/s BECIL — in the presence of T Mano Thangaraj, minister for information technology.

The Rs 1,815-crore project will cover 12,525 village panchayats in Tamil Nadu through optical fibre cable with high-speed bandwidth connectivity. Tamil Nadu FibreNet Corporation Limited (TANFINET), a special purpose vehicle, is implementing the project in Tamil Nadu at a sanctioned cost of Rs 1,815.3 crore. The project aims to provide 1 Gbps bandwidth connectivity to all village panchayats.

Exit mobile version