In line withthePrime Ministers announcement at COP26, Ministry of New and is working towards achieving 500 GW of installed electricity capacity from non-fossil sources by 2030, and achieving Net Zero by 2070.
A total of 172.72 GW capacity from non-fossil fuel based energy Resources has been installed in the country as on 31.10.2022. This includes 119.09 GW Renewable Energy, 46.85 GW Large Hydro and 6.78 GW Nuclear Power capacity. This constitutes a share of 42.26% of total installed generation capacity in the country i.e. 408.71 GW as on 31.10.2022.
Further, Central Electricity Authority (CEA) has carried out generation expansion studies with the projected All India peak electricity demand and electrical energy requirement of 325 GW and 2256 BU respectively for the year 2029-30 (as per the draft 20th EPS projections). Study reveals that the share of RE based installed capacity (including Large Hydro) in the capacity mix is likely to increase to around 480 GW by 2029-30. The share of RE (including Large Hydro) in the generation mix of the country, which stands at around 22% as of March, 2022 is likely to increase to around 41% by 2029-30.