Punjab and Himachal Pradesh are likely to lock horns over a recent decision of the hill state to impose a water cess on the hydropower generation on its turf. The Punjab State Power Corporation (Pspcl) is legally examining the decision.
Punjab has one hydropower project in addition to its stake in the Bhakra Beas Management Board (BBMB). The water cess will now be collected by the
64 74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube