He said the first phase of the project has 20 sub projects and the intends to develop Infrastructure at both poles of Atal Tunnel and develop it as a major tourist destination. She assured that the request of the state for reviving the ADB project will be considered and asked to send the proposal immediately.
He said that
132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube