-
ESA’s Biomass Mission Launch Imminent: The European Space Agency (ESA) is preparing to launch the Biomass satellite. The launch is expected in 2025.
-
Purpose: Carbon Cycle Understanding: The mission
74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube
Biomass Mission

Detailed 3D Forest Mapping: Biomass will create detailed 3D maps of dense and remote tropical forests.
Vega C Rocket Launch: The satellite will be launched aboard the Vega C rocket from French Guiana.
Sun-Synchronous Orbit (SSO): It will be placed in a sun-synchronous orbit at approximately 666 km altitude.
P-Band Radar Technology: The mission utilizes a long-wavelength P-band radar.
Penetrates Forest Canopy: The P-band radar can penetrate deep into the forest canopy.
Collects Information on Forest Components: It gathers data on tree trunks, branches, and stems, where the majority of carbon is stored.
Provides Forest Height and Biomass Data: Biomass will supply experts with new data on forest height and above-ground forest biomass from space.
Carbon Cycle & Forest Study: Scientists will use this information to study forest health, changes, and the role of forests in the carbon cycle.
Mission Duration: The Biomass mission is planned to last for five years.